Honeywell VERTEX C User Manual Download Page 7

Vertex Compliance System 

User Manual 

 

 

CHAPTER

 

2

 

Introduction

 

Analyzer side panel 

 Exterior

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

    

 
 

Summary of Contents for VERTEX C

Page 1: ...USER MANUAL VERTEX C ANALYZER ...

Page 2: ...fety 3 Continuous Monitor Symbols 3 FCC Compliance Statement 4 NCC Compliance Statement 4 Connectors 6 2 Introduction 7 Analyzer side panel Exterior 7 Analyzer side panel Interior 9 Analyzer Front view 9 Chemcassette 9 Clean the Optics 11 3 Additional Information 12 Specifications 12 ...

Page 3: ...sunit If this monitor is used in a manner not specified by Honeywell Analytics Inc the protection provided by the equipment could be impaired Continuous Monitor Symbols Symbol Description Lifting instructions low clearances slipping tripping hazards minor corrosive dangers Also used when defining personal protective equipment gloves dust masks etc Personal injury risk machinery hazards around guar...

Page 4: ...modifications not expressly approved could void your authority to use thisequipment This device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 This device may not cause harmful interference and 2 this device must acceptany interference received including interference that may cause undesired operation NCC Compliance Statement 取得審驗證明之低功率射頻器材 非經核准 公司 商號...

Page 5: ...ements are met The next cable parameters must be considered Braid Must have a minimum 90 coverage Foil When used with braid provides 100 coverage Do not use foil alone It has a tendency to break Twisted Pair Provides for cancelling of magnetic fields Stranded Pair Provides the greatest surface area Shield Termination Continuation of the shield to the cabinet earth ground is mostimportant For discr...

Page 6: ...nectors providing 360 shield coverage These connectors generally had metal shells Failure to properly secure the connector to the equipment will result in high emission levels Also poorly constructed or improperly assembled connectors can be a high source of radiatednoise and provide a path for external signals into the monitor ...

Page 7: ...Vertex Compliance System 7 User Manual CHAPTER 2 Introduction Analyzer side panel Exterior ...

Page 8: ...tex Compliance System 8 User Manual 1 Needle Valve for flow adjustment 2 Optics Block 3 RFID reader 4 Take up reel 5 Tape guide roller 1 Analyzer Number Tag 2 Analyzer Status LED 3 Analyzer Release Button ...

Page 9: ...pliance System 9 User Manual Analyzer side panel Interior 1 Analyzer Main Board 2 Sample pressure transducers 3 Sample flow transducers Analyzer Front view 1 Analyzer Status LED 2 Analyzer Number Tag Chemcassette ...

Page 10: ...Vertex Compliance System 10 User Manual ...

Page 11: ...ure side panel and reload the Chemcassette CAUTION Failure to replace and retighten hardware after service can adversely affect instrument performance and electromagnetic radiation compliance EMC Make certain all fasteners arereinstalled and firmly fastened NOTE Remove and clean one port at a time to insure proper orientation of tubing Do not remove the capillary tubing microtubes After cleaning t...

Page 12: ...to 325ft with thin wall tube 0 190 ID Sample linetubing 1 4 in 6 35 mm O D x 0 190in 4 83 mm Thin wall Tubing length Up to 400ft 120m with thin wall OPERATING CONDITIONS Temperature 59 F to 95 F 15 C to 35 C Humidity 20 80 RH Altitude 1000 ft 305 m to 6000 ft 1829 m above sea level Honeywell Analytics 405 Barclay Boulevard Lincolnshire Illinois 60069 USA is gas techsupport honeywell comTel 1 847 9...

Reviews: