Installation
SDC
28
MU1H-0438GE51 R0313
2.4 Connection of accessory parts
WARNING
According to VDE 0730, a separator for each mains terminal
is to be provided in the voltage supply to the control
equipment. Observe the local regulations regarding
grounding and zeroing.
As soon as the mains voltage is applied to terminals 21, 22,
2, 6, 12 and 18, headers X3 and X4 can also carry mains
voltage.
If the heating circuit and hot-water charging pumps do not
have an On / Off switch, but manual switch-on and switch-off
capability is still desired, the appropriate switches must be
installed by the customer. All accessory parts (sensors,
selectors etc.) are to be connected to the respective circuit
diagram.
2.5 Maintenance and cleaning
The controller is maintenance-free. The device can be cleaned
externally with a moist (not wet) cloth.
Pos: 3 /1 56-H oney well/M onta ge/ Mont age @ 1\ mo d_12 085 076 480 76_ 6.doc @ 1 107 0
3 Installation
See 9
Συναρμολόγηση / Installation, pg. 42.
Pos: 4 /1 56-H oney well/M onta ge/Ansc hlussb eleg ung @ 1\ mod _12 076 484 159 63_6 .doc @ 1 0035
Summary of Contents for SDC 12-31
Page 2: ...MU1H 0438GE51 R0313 ...
Page 89: ...SDC Εφαρμογές τηλεθέρμανσης District heating applications MU1H 0438GE51 R0313 89 ...
Page 90: ...Εφαρμογές τηλεθέρμανσης District heating applications SDC 90 MU1H 0438GE51 R0313 ...
Page 91: ...SDC Εφαρμογές τηλεθέρμανσης District heating applications MU1H 0438GE51 R0313 91 ...