![Honeywell MZ-PCSV74 Planning, Installation And Service Manual Download Page 25](http://html.mh-extra.com/html/honeywell/mz-pcsv74/mz-pcsv74_planning-installation-and-service-manual_153433025.webp)
Chapter 3 - Installation
Height option
Part
Part number
Tab number
1U
Blank front panel
Air duct baffle
51201248
51303521
-100
-100
2U
Blank front panel
Air duct baffle
51201248
51303521
-200
-200
3U
Blank front panel
Air duct baffle
51201248
51303521
-300
-300
4U
Blank front panel
Air duct baffle
51201248
51303521
-400
-400
3.4
Installing Dell T130 server and connecting cables
This section describes the procedure for installing and cabling the server in either 800 or 1000
millimeter (mm) deep LCN cabinets, model number MP-C8LCB1-Tab and MP-C1MCB1-Tab
respectively. This procedure assumes that a new 800 or 1000 mm deep cabinet was shipped from the
Honeywell factory with either the “fixed rail” mounting kit, model number TP-SPCMF1, or the “slide tray”
mounting kit, model number TP-SPCMS1, pre-installed.
l
Honeywell_server_back_panel_connections_T130.html#Honeywell_server_back_panel_
connections_T130
l
3.4.1
Honeywell server back panel connections
The figure in this section illustrates the back panel of the server and identifies the connectors for all
devices.
- 25 -