Installation

 

A

  Locating Manning GM-JR 

When unpacking the unit, inspect all boxes and 
contents for shipping damage. If any screws or other 
metal parts are missing, they must be found to ensure 
that the printed circuit boards will not be damaged 
when power is applied. 

The control unit is designed to be mounted on a solid 
(non-vibrating) wall through four holes in the two 
mounting flanges. While the physical location must be 
determined in part by local conditions, it is important to 
consider the following: 

• 

Protect the Manning GM-JR from rain, snow, 
water sprays, cleaning crews, and physical 
damage. 

• 

Mount the unit on a solid wall (non-vibrating) at 
eye level for convenience in taking readings, 
servicing, etc. 

• 

The Manning GM-JR is 

NOT

 explosion proof.  

DO NOT MOUNT

 in a hazardous atmosphere. 

• 

Operating temperature for the Manning GM-JR 
is 0

o

 F to +120

o

 F. 

• 

Pre-punched holes are provided in the bottom 
of the enclosure for cable access. 

DO NOT

 drill 

holes in the top of the cabinet as this will void 
the warranty. 

• 

If hole drilling is required, be sure to remove all 
metal filings. 

• 

Mounting dimensions for the NEMA 1 enclosure 
are shown in Figure 1.  

B

 Wiring 

Electrical wiring must comply with all applicable 
codes. Plant equipment that may be involved and 
operating conditions should be discussed with local 
operating personnel to determine if any special needs 
should considered. 

Nearly all start-up problems are due to improper wiring 
or monitor configuration. Please follow these guide-
lines carefully. Figure 2 presents a wiring diagram for 
the Manning GM-JR in the feed-through configuration. 

 

Relay Wiring: 

The relay has Form C, dry contacts. Any required 
power source must be within the amp rating and fused 
or current limited to keep from damaging the contacts. 

Relay wiring must be run in separate conduit from the 
sensor cable if the relay circuit is AC. 

The maximum relay rating is 0.5 amp at 24 VDC or  
24 VAC, or 0.25 amp at 120 VAC.   

Sensor Wiring:  

 

Respect minimum voltage requirements. 

• 

See sensor manual for proper sensor cable. 

• 

See sensor manual for proper sensor location. 

• 

Never run AC circuits in the same conduit as the 
sensor cable. 

 

Note:  Relays are energized in a non-alarmed 
condition so that a power loss in the Manning 
GM-JR will result in an alarm. 

Figure 1:  NEMA 1 enclosure mounting dimensions  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Manning GM-JR

Gas Monitor

2"

5/16" diameter

6 3/4"

Risk of electrical shock. 

Summary of Contents for Manning GM-JR

Page 1: ...0 06 Release C Honeywell Confidential Proprietary This work contains valuable confidential and proprietary information Disclosure use or reproduction outside of Honeywell Inc is prohibited except as authorized in writing This unpublished work is protected by the laws of the United States and other countries ...

Page 2: ...r a particular purpose and makes no express warranties except as may be stated in its written agreement with and for its customers In no event is Honeywell liable to anyone for any indirect special or consequential damages The information and specifications in this document are subject to change without notice Manning is a registered trademark of Honeywell International Inc Other brand or product ...

Page 3: ...ussels Belgium Latin America Honeywell International Inc 1 847 955 8200 Lincolnshire IL Sales Information Contact us at detectgas honeywell com Symbol Definitions The following table lists those symbols used in this document to denote certain conditions Symbol Definition ATTENTION Identifies information that requires special consideration TIP Identifies advise or hints for the user often in terms ...

Page 4: ...m System This manual will convey the operating details of the alarm system ensure proper installation and demonstrate start up and routine maintenance procedures ATTENTION This manual must be carefully followed by all individuals who have or will have the responsibility for using or servicing the sensor Warranties made by Honeywell Analytics with respect to this equipment will be voided if the equ...

Page 5: ... power up delay feature that places the output in a normal condition for one minute to allow for sensor stabilization The Manning GM JR will support all Manning sensors including oxygen which requires a down scale alarm Monitoring Options The Manning GM JR can be mounted in its own NEMA 1 enclosure or in the door of most Manning sensor enclosures In the Feed Through Configuration the Manning GM JR...

Page 6: ...ution Trip accuracies at these 5 increments are within 1 of set point Time Delays Alarm relay is 10 second delay on 30 second delay for reset after alarm condition clears Power Up Time Delay On application of power the alarm relay will be held in the normal state for one 1 minute to allow the sensor to stabilize Relay Alarm Output Relay is rated at 0 5 amp at 24 VDC or 24 VAC 0 25 amp at 120 VAC R...

Page 7: ...g is required be sure to remove all metal filings Mounting dimensions for the NEMA 1 enclosure are shown in Figure 1 B Wiring Electrical wiring must comply with all applicable codes Plant equipment that may be involved and operating conditions should be discussed with local operating personnel to determine if any special needs should considered Nearly all start up problems are due to improper wiri...

Page 8: ...4 VDC or 24 VAC Max or 0 25 amp at 120 VAC Note JP1 JP2 and JP3 are not installed for the Feed Through Configuration Outside bare wrap connects to SHLD terminal of sensor Black connects to GND terminal of sensor Connect to 24 VDC power supply positive side 300 mA sensor requirement Connects to signal input of monitoring equipment Connects to case ground of monitoring equipment earth ground Connect...

Page 9: ...ayed by the bargraph C Start Up Procedures Before applying power make a final check of all wiring for continuity shorts grounds etc It is usually best to disconnect external alarms and other equipment from the unit until the initial start up procedures are completed After power up allow 24 hours for the system to stabilize before testing the sensor Because sensors are normally located at a distanc...

Page 10: ... see sensor manual The setpoint shorting tab must be installed see Figure 4 Note 4 If it is removed the unit will go into an alarm condition after the 10 second delay If questions arise call Honeywell Analytics E Maintenance The Manning GM JR is designed for long life and high reliability Honeywell Analytics recommends checking signal voltages monthly and logging them Additionally the sensor being...

Page 11: ...he gas sensor has been expended rather than failed prematurely this limited warranty shall not apply to the Product C This limited warranty does not cover consum able items such as batteries or items subject to wear or periodic replacement including lamps fuses valves vanes sensor elements cartridges or filter elements 3 Warranty Limitation and Exclusion Honeywell Analytics will have no further ob...