background image

Installation

The Repeat Panel Set consists of:

Parts

Qty

j

Backbox assembly

1

k

Outer door assembly

1

l

Inner door assembly
(with membrane labels for BS panel)

1

m

20 Way ribbon cable

1

n

40 Way ribbon cable

1

†

Spares pack [Battery lead, Link wire (not used),
1 x 2A Fuse 20mm x 5mm QB,
2 x 3.15A Fuse 20mm x 5mm AB ceramic]

1

‡

Battery 12V 7Ahr

1

Fuses on the Master Repeat Card
Fuse

Rating

FS4

3.15A AS 20mm x 5mm

FS2

3.15A AS 20mm x 5mm

FS3

2A QB 20mm x 5mm

Back box mounting

a

Find the Repeat panel Back box



package and

remove the temporary cover.

b

Secure the back box to the wall with suitable
fixings. If the backbox is to be semi-flushed then
use the optional semi-flush surround.

c

Terminate the cable at the entry point leaving

400mm

tail wire length.

&

If mains supply cable ends are not

required to be connected then ensure the ends are
insulated for safety.

d

Refit the temporary cover to protect the panel
until all building work is complete.

Doors, Cables and Power up

The doors and cables can be installed after the
building work has finished.

a

Remove the protective cover from the backbox.

b

Fit the inner door

ƒ

to the panel enclosure

remembering to connect the earth lead from the
backbox to the inner door. Fit the outer moulded
door

‚

to the backbox.

c

Wiring the panel:

&

Ensure the mains supply is completely

powered down before wiring the mains cable ends.

connect the mains cable to terminal block P9
on the Master Repeat Card.

fit battery lead

†

supplied in the spares to

connector P5 on Master Repeat Card.

connect the loop cables to terminal block P16
on the Master Repeat Card.

connect the 40 way ribbon cable

…

to the

Master Repeat Card connector P2 and the
other end to Display Key Card on the top right
edge connector - P1.

connect the 20 way ribbon cable

„

to the

Master Repeat Card connector P1 and the
other end to Display Key Card on the top right
edge connector - P6.

d

Power-up the panel by switching ON the mains
supply and then connect the battery leads to the
battery and note:

all the LEDs on the panel are lit for a short
duration and a power up message displayed.

the local buzzer sounds

the display reads:

Main panel is off Line

the

Fault

and

System Fault

LEDs are lit.

Data and installation

Vigilon Repeat panel (EN/BS)

2

4188-839_issue 8_07/14_pt1_EN/BS new Repeat_inst

cL

310mm

115mm

115mm

370mm

285mm

45mm

Floor level

1.65m

Cable entry points
4-off - Back and 4-off - Top

3-off
Earth points

Backbox

Fixing centres
4-off

01 L1 02 L2

0C LC

P9

L

N

N

P17

DANGER

BT+

BT

-

+

RS485

0V 24V

-

WRITE PROTECT

BUZZER
DISABLE

P8

DANGER
DO NOT
REMOVE

L

N

P5

FS2

FS4

P16

P4

P2

P1

SW3

PB2

WD1

P14

P7
USB

FS3

2A(QB)

RESET

DANGER

WARNING

Removal of

cover exposes

live parts.

Repeat Panel

Cross section of the wall to which
the panel is to be semi-flush mounted

Aperture

Flush
Surround

5mm diameter
fixing holes

Aperture Height:
380mm

Aperture Width: 320mm

Aperture depth should
not be less than: 59mm

Repeat panel
semi-flush surround

www.acornfiresecurity.com

www.acornfiresecurity.com

Summary of Contents for GENT VIG-RPT-72

Page 1: ...o 45ºC Relative humidity Non condensing Up to 90 temperature 5 C to 45 C Battery 12V 7Ah sealed lead acid Mains operating voltage 230V 15 10 50 60Hz Rated Current 0 2A Emission BS EN61000 6 3 2001 Immunity BS EN50130 4 1996 Part 4 LVD BS EN 60950 2006 Ingress protection IP31 estimated Colour Door Pantone 422 Back box Graphite Grey RAL 7024 Controls with door closed Access level 1 Next and Previous...

Page 2: ...o terminal block P9 on the Master Repeat Card fit battery lead supplied in the spares to connector P5 on Master Repeat Card connect the loop cables to terminal block P16 on the Master Repeat Card connect the 40 way ribbon cable to the Master Repeat Card connector P2 and the other end to Display Key Card on the top right edge connector P1 connect the 20 way ribbon cable to the Master Repeat Card co...

Page 3: ...e Loop COM Master Repeat Card 01 L1 02 L2 0C LC P9 L N N P17 DANGER BT BT RS485 0V 24V WRITE PROTECT BUZZER DISABLE P8 DANGER DO NOT REMOVE L N P5 FS2 FS4 P16 P4 P2 P1 SW3 PB2 WD1 P14 P7 USB FS3 2A QB RESET DANGER WARNING Removal of cover exposes live parts mains electrical supply Loop OUT Previous Next Spur Connection XXXXX Fire Alarm System GENT 2007 Designed to EN54 Pt 2 4 Panel healthy 15 45 1...

Page 4: ...control buttons must always be left in an enabled state with the control buttons link fitted At the end of their useful life the packaging product and batteries should be disposed of via a suitable recycling centre and in accordance with national or local legislation Do not dispose of with your normal household waste Do not burn WEEE Directive At the end of their useful life the packaging product ...

Page 5: ...r sounds Cancel the buzzer using the local Cancel buzzer button Test functions When operating the SOUND ALARMS button it will activate the alarm sounders in the system Display test to ensure all LEDs are working Sound Alarms Silence Alarms Display of Fire events Reset Operation of U1 U4 Function keys as configured at the control panel Verify as configured at the control panel 4188 839_issue 7_08 1...

Page 6: ...configuration of the system To create or change an existing Engineer PIN You will need to be at Access level 3 if an Engineer PIN is already set up Press the Menu On Off button and select Test Eng UserCode then momentarily press etc to select Config New Pass and then type a new PIN or change an existing PIN and press the Enter key will appear if a PIN is already setup It is recommended that the PI...

Page 7: ...ith Mk4 MRC Menu map Control E C Q Key E Enter C Cancel Q Quit Verify etc Params 0 3 E C Q Timeslot etc Params 1 16 Delay On Params HH MM SS On E C Q Off Off DelayBlk Params 1 16 Delayed E C Q Params MM SS 0 10min End E C Q Stop Group EN BS EN BS Option for BS Repeat panel only Option for EN Repeat panel only Sector Build Params 1 255 E C Q Aux Rly Params 1 2 E C Q Params 1 32 E C Q Enable Disable...

Page 8: ... Params 0 100 Signal C Q E Params 16 100 C Q E Params 0 255 Params 1 100 C Q E etc State enable Params 1 8 Params 0 15 C Q E Params 0 15 State disable TimeBlok etc Voice Tone number Set Up Loop Params 1 207 Device It is important to back up the data at the main control panel following any changes using the in Setup menus at the repeat panel Menus accessible with panel door open and AL2 password Ac...

Page 9: ...8 C Q E N C P R 1 100 Loop Params 1 207 E Params 0 15 Q C E E Params C Q 1 207 Loop Params Fault Disable Exceptions Sub Faults HistFire etc etc Warning Device 1 4 1 32 Params Loop Params 1 255 E C Params Q MCP IO Line Device Device Sector Card etc Params 1 207 C Q E 1 8 Device Params Q E etc Active Historic Events Label UserCode TimeAvg Status etc Loop Map Control Set Up Info Test Eng EN BS Repeat...

Reviews: