- Fitting
and bolting
the barrier
gate with M16x100 screw: the
erection guardrail is positioned
horizontally.
7
- With slings attached to the 2
lifting rings, the topmost module
is fitted.
Bolt the 4 uprights together using
M24 screws.
9
- At the access levels, the guar-
drails are positioned so as to privile-
ge access by the main face A (face
names shown on the sticker).
10
- Fill the Pre-Use Inspection Report
8
- Check that the stair tower has
been anchored before unhooking
the slings.
Guardrails will be swung out of
the way to allow access to the
required level.
21 cm
The last step
used should
ideally be
placed 21 cm
lower than the
floor being
serviced.