1
2
3
QUICK START GUIDE
Fill with water and plug into a standard
power outlet.
Place near an open door or window.
Note : Evaporative air cooler requires cross ventilation.
Turn ON and enjoy the cooling breeze.
Note: Start with LOW speed and gradually increase
to higher speed for optimum cooling performance.
Note: Please make sure the household power voltage
matches the product specifications.
Summary of Contents for CL20AE
Page 5: ...器 ...
Page 17: ......
Page 19: ......
Page 21: ...器 器 器 器 器 ...
Page 23: ...器 ...
Page 25: ......
Page 29: ...器 器 器 器 ...
Page 31: ...器 器 器 器 器 器 ...
Page 33: ...器 器 器 器 ...
Page 35: ...器 器 器 器 器 器 ...
Page 37: ...器 器 器 ...
Page 39: ...COOL SWING PUMP PLUG IN PLUG COOL F R L N PCB H M L N CAPACITOR M M ...