CGW-MB Installation and Users’ Manual | P/N:LS10248-000HW-E | REV.G | JUL/31/2022
23
Section 4: Installation
You can use a portable CLSS Gateway mainboard in the fire detection system.
4.1 Mounting the Portable CLSS Gateway Mainboard
Refer to your panel documentation to know about mounting the CLSS Gateway
mainboard onto the panel.
4.1.1 Connecting to a Fire Alarm Panel
To know about supported panel variants, their connection options, and commissioning
procedure, refer to the
“Connecting to the Panels” on page 135
.
4.1.2 Connection Options
The CLSS Gateway mainboard board can be connected with a cellular module, wireless
aerials, the
CLSS Site Manager
, a configuration computer, a panel, a mobile device, and
an external power supply.
illustrates the connection options at the top side of the CLSS Gateway
mainboard board.
Figure 4.1: CLSS Gateway mainboard Connections - Top Side
illustrates the CLSS Gateway mainboard connection options at the bottom
side of the CLSS Gateway mainboard board.
Figure 4.2: CLSS Gateway mainboard Connection Options - Bottom Side
Fire Alarm Panel
CLSS
Cloud
Modbus
Client
Configuration
Computer
Mobile
Connection
/NUP
Ethernet
Connection
WHITE COLOR
GREEN COLOR
RED COLOR
BLACK COLOR
BROWN COLOR
P7
P2
P4
J5
P1
Future Use
UART/TTL
Future Use
(
Eth 1
)
(
Eth 0
)