
Product Manual
Honeywell
| Smart Energy
Elster Kent Metering (Pty) Ltd
60 Commando Road, Industria Ext 2
Johannesburg, 2093
South Africa
Reactive
Energy
01
03
0126
294
L3
Forward
Reactive
Energy
54
Read
4
float
01
03
0128
296
Reverse
Reactive
Energy
55
Read
4
float
01
03
012A
298
L1
Reverse
Reactive
Energy
56
Read
4
float
01
03
012C
300
L2
Reverse
Reactive
Energy
57
Read
4
float
01
03
012E
302
L3
Reverse
Reactive
Energy
58
Read
4
float
01
06
0002
2
Meter ID
1
Write
2
01
06
0003
3
Baud Rate
2
Write
2
01
10
0009
9
SO
OUTPUT
4
Write
4
float
01
06
0042
66
Combined
Code
5
Write
2
01
06
000D
13
Cycle
time
7
Write
2
6. Installation Instruction
6.1 Installation instructions
Installation staff should be experienced electrician or specialized person, and should ensure that they
have read this user guide.
During installation, if it comes across severe strike or falling, which causes obvious damage trace, don’t
install it or turn it on. Please contact us in time.
Before leaving our factory, all the meters have been checked out and lead sealed, they can be installed
directly.
Meters should be installed indoors or outdoors in a cabinet. The wall which is installed should be firm
and fireproof, besides, no corrosive gas in the air.