FUEL SYSTEM (PGM-FI)
6-27
3. Injector Resistance Inspection
Turn the ignition switch OFF.
Measure the resistance of the injector connector
terminals.
Is the resistance within 11– 13
Ω
(20
°
C/68
°
F)?
YES
–
NO
–
Faulty injector
4. Injector Signal Line Open Circuit Inspection
Disconnect the ECM 33P connector.
Check the continuity between the injector 2P
connector of the wire harness side and ECM 33P
connector of the wire harness side.
Is there continuity?
YES
–
NO
–
Open circuit in Pink/Blue wire
5. Injector Signal Line Short Circuit Inspection
Check for continuity between the injector 2P con-
nector and ground with the ECM connector dis-
connected.
Is there continuity?
YES
–
Short circuit in Pink/Blue wire
NO
–
Replace the ECM with a known good
one, and recheck; refer to Key Registra-
tion Procedures (page 23-4)
2P CONNECTOR (Injector
side of male terminals)
Connection: Pink/Blue – No. 16 (Pink/Blue)
TOOL:
Test probe
07ZAJ-RDJA110
2P CONNECTOR
(Wire side of female terminal)
33P CONNECTOR
(Wire side of female terminal)
P/Bu
Connection: Pink/Blue – Ground
2P CONNECTOR
(Wire side of female terminal)
P/Bu
Summary of Contents for SH300I 2006
Page 54: ...MEMO...
Page 55: ...2 1 2 2 TECHNICAL FEATURES HEATER LESS O2 SENSOR 2 2 UNIT SWING ENGINE LAYOUT 2 3...
Page 58: ...MEMO...
Page 216: ...MEMO...
Page 242: ...CYLINDER PISTON 10 2 CYLINDER PISTON COMPONENT LOCATION...
Page 250: ...MEMO...
Page 270: ...MEMO...
Page 296: ...MEMO...
Page 314: ...MEMO...
Page 394: ...MEMO...
Page 422: ...MEMO...
Page 440: ...MEMO...
Page 456: ...MEMO...
Page 484: ...MEMO...
Page 499: ...24 1 24 24 WIRING DIAGRAMS STD type 24 3 ABS type 24 4...
Page 509: ...MEMO...