47
OPERATION
STANDBY POWER
Connections to a Building’s Electrical System
Connections for standby power to a building's electrical system must
be made by a qualified electrician. The connection must isolate the
generator power from utility power, and must comply with all
applicable laws and electrical codes.
In some areas, generators are required by law to be registered with
local utility companies. Check local regulations for proper registration
and use procedures.
System Ground
This generator has a system ground that connects generator frame
components to ground terminals in the AC output receptacles. The
system ground is not connected to the AC neutral wire.
Improper connections to a building’s
electrical system can allow current
from the generator to backfeed into
the utility lines.
Such backfeed may electrocute
utility company workers or others
who contact the lines during a
power outage, and the generator
may explode, burn, or cause fires
when utility power is restored.
Consult the utility company or a
qualified electrician prior to making
any power connections.
36Z376000.book 47 ページ 2014年9月19日 金曜日 午後6時26分
Summary of Contents for EU70is
Page 93: ...90 MEMO 36Z376000 book 90 ページ 2014年9月19日 金曜日 午後6時26分 ...
Page 185: ...90 NOTES PERSONNELLES 33Z376000 book Page 90 Thursday September 25 2014 10 07 PM ...
Page 277: ...90 MEMO 34Z376000 book Page 90 Thursday September 25 2014 9 59 PM ...
Page 369: ...90 MEMO 3LZ376000 book Page 90 Thursday September 25 2014 10 17 PM ...
Page 371: ...36Z376000_WIRING_DIAGRAM fm 51 ページ 2014年9月17日 水曜日 午後12時30分 ...