Honda Automobiles GCV160LA0S3T Service Bulletin Download Page 2

Page 2 of 7 

 

ENGINE #12

 

FEBRUARY 2013 

 

REPAIR PROCEDURE 

 
The main steps in the procedure are: 
 

  Replace the thermo-wax with an improved slightly longer version. 

  Apply Hondabond HT sealant to the thermo-wax assembly to improve heat transfer. 

  Inspect the Auto Choke System control assembly for binding and replace if necessary. 

  Install a temperature regulator bracket on the cylinder barrel to help the thermo-wax heat up faster. 

 

 
 

Important

: Allow the engine to cool for at least an hour before beginning the repair. Installing the choke 

components on a hot engine may result in choke binding or improper choke function. 
 
 

Replace thermo-wax and apply Hondabond HT 

1.  Turn  the  fuel  valve  OFF  and  drain  the  fuel  from 

the  carburetor  float  chamber  into  an  approved 
container. 

2.  Remove  the  air  cleaner  cover  and  air  cleaner 

element. 

3.  Completely  loosen  the  two  6  x  85  mm  bolts 

holding the air cleaner case, but don’t remove. 
 
 
 
 

 
 

4.  Disconnect  the  crankcase  breather  tube  while 

holding  the  bolts  in  place  and  then  pull  the  air 
cleaner case, carburetor, air guide gasket, and auto 
choke  control  assembly  as  a  unit  away  from  the 
engine. 

 
 
 
 
 
 

 
 

5.  Remove the existing thermo-wax from the cylinder 

barrel. 

 
 
 
 
 

 

Summary of Contents for GCV160LA0S3T

Page 1: ...However this also can occur after the engine partially cools from normal operating temperatures The symptom can occur when the engine is slightly warm but the choke plate is still in the fully closed...

Page 2: ...re beginning the repair Installing the choke components on a hot engine may result in choke binding or improper choke function Replace thermo wax and apply Hondabond HT 1 Turn the fuel valve OFF and d...

Page 3: ...el Push it into the cavity until fully seated The Hondabond HT should fill the gap between the cylinder barrel and thermo wax Remove any excess Hondabond HT that builds up around the thermo wax 8 Remo...

Page 4: ...embly must be replaced 10 Inspect the air guide and insulator gaskets Replace any gasket that appears damaged 11 Install the auto choke control assembly onto the 6 x 85 mm flange bolts 12 Install the...

Page 5: ...he proper torque TORQUE 89 in lb 10 N m 16 After tightening the bolts push on the choke control tab to open the choke and release it to confirm the choke opens smoothly and springs closed when release...

Page 6: ...lb 12 15 N m 6 Reinstall the fan cover and recoil starter and tighten the 6 mm flange nuts to the proper torque TORQUE 75 in lb 8 5 N m Check operation 1 Turn the fuel valve ON and check for leaks 2 S...

Page 7: ...Bolt 1 WARRANTY INFORMATION The normal warranty applies Open a Quick Claim for Canadian engines and a Long Claim for non Canadian engines Be sure your claim contains the following information Failed...

Reviews: