step 1.
A1
A3
A3
A2
B
B
B
B
C1
C2
D2
D1
D2
D1
D1
D1
E
F3
E
E
F1
F2
fig.1: Attach the rail fences (B) onto the standing post (C1/ C2) and screens (A1/A2/A3), as fig.1.
fig.2: Align the holes in (E) with those in beams (D1/ D2), (A1/ A2/ A3),(C1/ C2), and fix them with bolts (H1), washers(H2), as fig. 2.
fig.3: Fix (D2) to (A1/ A2/ A3) with bolts (H3), washers (H4) and nuts (H5), as fig.3.
fig.4: Fix the standind post (C1/ C2), rail fences (B) on the frame fixer (F1) and use bolts (H1) and washers (H2) to secure them as fig. 4; fix the rail fences (B),
screen (A1/ A2) on the frame fixer (F2), and use bolts (H1) and washwe (H2) to secure them, as fig. 4-1; fix the rail fences (B), screen (A3) on the frame fixer
(F3), and use bolts (H1) and washer (H2) to secure them, as fig.4-2.
A1
2
3
(
/
A
A
)
C C
1
2
(
)
B
H1
H1
H1
H2
H2
H2
H2
D1
E
D2
H1
H4
H3
H4
H5
D2
A1 A2 A3
(
/
)
H2
H1
H2
H1
H2
H1
H2
H1
B
B
C1 C2
(
)
H1
H1
H2
H2
H1
H2
B
F2
A 2 A1
( )
H1
H1
H2
H2
A3
B
H1
H2
F3
(H1)
x 44
(H2)
x 44
(H3)
x 4
(H4)
x 8
M5x15mm
M5 washer
M6 washer
(H5)
x 4
(H10)
x 2
M6 nut
bolt
bolt
wrench
M6x60mm
fig. 2
fig. 1
fig. 4
fig. 4-1
fig. 4-2
fig. 3
fig. 2
fig. 1
fig. 3
fig. 4
fig. 4-1
fig. 4-2