6
system assembly
1. choose a suitable site
3. install gas pipes & drainage
4. activate system
5. continue feeding &
check for flammable gas
6. initial feeding period
(kitchen waste systems)
2. assemble the system
use system normally!
2 hours
1 hour
wait 1 day
1 - 3 weeks *
2 weeks *
From Assembly to Usage:
Equipment Needed
screwdriver (flat) OR
socket wrench 6/7/8
boiling water
water (2650 liters)
dry sand (96 liters)
Assembly with 2 persons
recommended
*5. continue feeding the system manure as per activation instructions (page 32). you may start trying to light the gas as soon as the gas tank has visibly started to fill
*6. for manure-only systems, there is no initial feeding period and you should continue feeding throughout the activation process (step 5.)
Summary of Contents for HBG 4.0
Page 1: ...1 HB4 OM 150221 VERSION 150221 HBG 4 0 HOUSEHOLD BIOGAS SYSTEM OWNER S MANUAL 2021 HOMEBIOGAS...
Page 13: ...13 i i ii ii iii i iii x4 parts bag 1 LUBRICANT LUBRICANT...
Page 15: ...15 i LUBRICANT 1 parts bag LUBRICANT...
Page 16: ...16 Inlet sink orientation short cord plunger slot towards back long cord towards front x2...
Page 19: ...19 check filled digester for leaks contact HomeBiogas if any leaks are seen...
Page 20: ...20 ii i LUBRICANT x2...
Page 21: ...21 i ii iii v iv 90...
Page 22: ...22 x48 i ii iii use dry sand only sand bags...
Page 23: ...23 x5 x5 x5 x5 x3 x3 x3 x3 x3 x3 x3 x3 x1 x1 x1 x1...
Page 24: ...24 iii ii i GAS FILTER remove 2 protective stickers from cover base of gas filter...
Page 29: ...29...
Page 43: ...43...
Page 47: ...47...