Assemble the right lifting arm (NO. 5) and left lifting arm (NO.6)to the body (NO.1) with two plunger
(NO.10),lock the plunger with a plunger cover (NO.9).
Assemble the shovel bucket(NO.7)to the lifting arm system with inserting a plunger (NO.10) and securely
fastening a screw (NO.8)as in picture.
02
03
Summary of Contents for 370-177
Page 6: ......