Homa SKB 6 Original Instruction Manual Download Page 22

22 | EngliSH

Tubes

Connect the pressure pipe with the pressure side of the 
pump station. Use the “Delomet”-Glue from the acces-
sories kit. Arrange the glue of the winding from pressure 
port, screw the pressure pipe on the pressure port and 
let it dry. The venting pipe and the electrical connections 
should be installed in different pipes The electric power 
supply to the pump station must be arranged separately 
from the earth fault system.

Equipotential bonding

The equipotential bonding serves to protect against in-
admissibly high potential differences and to reduce dan-
gerous contact voltages. In the potentially explosive at-
mosphere, the potential equalization additionally serves 
to prevent explosions caused by ignitable gases caused 
by ignition sparks. Pump shafts that are connected to the 
public sewer network are considered to be potentially ex-
plosive areas of Zone 1. Within Zone 1, a potential equal-
ization is mandatory (VDE 0165-5.3.3 of 2.91). The equipo-
tential bonding cable must be attached to the strap clamp 
(see figure). Establish the potential equalization according 
to VDE 0100, part 540.

Pressure probe with protective tube

The protective tube with the probe is already mounted in 
the shaft. Under no circumstances should you lean on this 
pipe or enter it. As a result, the tube could be adjusted in 
its height and thus the switch-on points would also be 
adjusted.

5.6. Start-Up

The „Start-up“ chapter contains all the important instruc-
tions for the operating personnel for starting up and oper-
ating the machine safely.

The following specifications must be adhered to and 
checked:

• 

Type of installation

• 

Operating mode

• 

Minimum water coverage / max. submersion

If the machine has not been operated for some time, 
check these specifications again and rectify any faults 
you find!

Clamp for 
Equipotential 
bonding

The operation and maintenance handbook must al-
ways be kept either by the machine or in a place spe-
cially reserved for it where it is accessible for operat-
ing personnel at all times.

In order to prevent damage or serious injury during start-
up of the machine, the following points must be observed:

• 

The machine may only be started up by qualified 
personnel. The safety advice must be followed at 
all times.

• 

Every person working on the machine must have re-
ceived, read and understood this operating and main-
tenance manual. This must also be confirmed with a 
signature in the machine operator list.

• 

Activate all safety devices and emergency stop ele-
ments before start-up.

• 

Electrical and mechanical settings may only be made 
by specialists.

• 

Read the instruction manual of the pump and the con-
trol unit

• 

Before starting the pump station make sure that all 
isolating valves are open and check that the unit runs 
satisfactorily.

• 

Turn the operation switch into the position „Auto“.

5.7. Electrical system 

Before operation, an expert check must secure that 

the required electrical protection measures exist. 

The connection to ground, earthing, isolating trans-

former, fault current breaker or fault voltages circuit 

must correspond to the guidelines set forth by the 

responsible power plant.

The voltage required in the technical data sheet must 

correspond to the existing line voltage.

Make sure that the electrical pin-and-socket con-

nections are installed flood- and moisture-safe. Be-

fore starting operation check the cable and the plug 

against damages.

The end of the pump power supply cable must not be 

submerged in order to prevent water from penetrat-

ing through the cable into the motor.

The normal separate motor starter/control box of 

standard as well as of explosion proof pumps must 

not be installed in explosive environments.

The electrical connection of the pump should be carried 
out in accordance with local requirements. The operating 
voltage and frequency are marked on the pump and con-
troller nameplates. Voltage tolerance: +6% up to -10% of 
the voltage stated on the nameplates. Make sure that the 
pumps of the pump station are suitable for the electricity 
supply available at the installation site. HOMA SK 6 / SK 
9 pump stations are supplied with a control box. Control-
ler for single-phase pumps also incorporate the operating  
capacitors required.

The pump motors have a thermal switch incorporated in 
the motor windings. The thermal switch protects the mo-
tor from overheating by cutting off the supply to the pump 
via the controller.

Summary of Contents for SKB 6

Page 1: ...Original Betriebsanleitung EN Original Instruction Manual SKB 6 SKB 9...

Page 2: ...des Betriebs 06 2 7 Sicherheits und berwachungseinrichtungen 06 2 8 F rdermedien 06 2 9 Schalldruck 06 3 Allgemeine Beschreibung 07 3 1 Verwendung 07 3 2 Einsatzarten 07 3 3 Aufbau 07 4 Verpackung Tr...

Page 3: ...eitet und frei von M ngeln ist Alle Produkte besitzen einen h chstm glichen Qualit ts standard und unterliegen vor Auslieferung einer techni schen Endkontrolle Durch eine von HOMA Pumpenfabrik GmbH er...

Page 4: ...en de 1 6 Fachbegriffe In dieser Betriebsanleitung werden verschiedene Fachbe griffe verwendet Trockenlauf Ein Trockenlauf ist auf jeden Fall zu vermeiden hier l uft die Pumpe mit voller Drehzahl es i...

Page 5: ...tillstand gekommen sein Der Bediener hat jede auftretende St rung oder Unregelm igkeit sofort seinem Verantwortlichen zu melden Eine sofortige Stillsetzung durch den Bediener ist zwingend erforderlich...

Page 6: ...seinrichtungen ausgestattet Diese Einrich tungen d rfen nicht demontiert oder abgeschaltet wer den Einrichtungen m ssen vor der Inbetriebnahme vom Elek trofachmann angeschlossen und auf eine korrekte...

Page 7: ...TCM GRP Verwendbare Steuerger te PS15 PS25 4 Verpackung Transport und Lagerung 4 1 Anlieferung Nach Eingang ist die Sendung sofort auf Sch den und Vollst ndigkeit zu berpr fen Bei eventuellen M ngeln...

Page 8: ...t werden kann Die Hebevorrichtung muss eine maximale Tragkraft aufweisen die ber dem Gewicht des Schachtes mit Anbauteilen und Kabel liegt Das Fundament Bauwerk muss eine ausreichende Festigkeit f r e...

Page 9: ...ebssicherheit Die SKB 6 bzw SKB 9 Sch chte sind f r normale Ein satzf lle bis zu einem Grundwasserstand von 0 5m unter Schachtoberkante auftriebssicher ausgef hrt Bei einem h heren Grundwasserstand ka...

Page 10: ...Stecker sind vor Gebrauch auf Besch digung zu pr fen Das Ende des Anschlusskabels darf nicht ins Wasser eingetaucht werden da sonst Wasser in den Mo tor Anschlussraum gelangen kann Motorschutzschalte...

Page 11: ...tehen m s sen dekontaminiert werden Ebenso ist darauf zu achten dass sich keine gesundheitsgef hrdenden Gase bilden oder vorhanden sind Bei Verletzungen durch gesundheitsgef hrdende Me dien bzw Gase s...

Page 12: ...80 oder Klasse B 785x600x125 max 3 Schachtauflageringe DIN 4034 2 785x625x80 Gu Schachtabdeckung 700 Klasse A hnl DIN 19596 L ftungs Kabelleerrohr Zulauf Sp lanschlu optional Vakuumbrecher Anschlu ver...

Page 13: ...DEUTSCH 13 Notizen Notes...

Page 14: ...ol devices 18 2 8 Pumped fluids 18 2 9 Sound Pressure 18 3 General description 19 3 1 Application 19 3 2 Types of use 19 3 3 Construction 19 4 Package Transport Storage 20 4 1 Delivery 20 4 2 Transpor...

Page 15: ...damages In order to ensure that your guarantee claim is processed as efficiently as possible please contact us or the appro priate sales representative Once your claim for a return has been agreed yo...

Page 16: ...e In this installation type the product is installed dry i e the pumped fluid is delivered to and discharged via a pipeline system The product is not immersed in the pumped fluid Please note that the...

Page 17: ...his her superior immedi ately should any defects or irregularities occur It is of vital importance that the system is shut down immediately by the operator if any problems arise which may endanger saf...

Page 18: ...must be checked by an electrician for proper functioning before start up see the Electrical Connection data sheet Please remember that certain equipment requires a decoder device or relay to function...

Page 19: ...onstruction Smell tight and watertight pump station with one or two pumps The pump station consists of a collecting tank with all necessary ports for the connection of inlet pipe discharge pipe and ai...

Page 20: ...ccurring during transport and stor age The packaging should be stored in a safe place if the location used is changed frequently 4 3 Storage Newly supplied products are prepared that they can be store...

Page 21: ...ation to 97 DPr Insert shaft then align it vertically and horizontally Install shaft cover bearing ring Topsoil clay other cohesive soils and as a rule the excavated soil are not suitable for backfill...

Page 22: ...ine the following points must be observed The machine may only be started up by qualified personnel The safety advice must be followed at all times Every person working on the machine must have re cei...

Page 23: ...e and the system may only be carried out by trained specialists exercising extreme care in a safe workplace Proper protective clothing is to be worn The machine must be disconnected from the electric...

Page 24: ...85x600x80 or Class B 785x600x125 Max 3 support rings DIN 4034 2 785x625x80 Cast shaft cover 700 Class A like DIN 19596 air vent cable pipe Intake Flush cleaning connection optional vacuum breaker Scre...

Page 25: ...English 25 Notizen Notes...

Page 26: ...ag tijdens het bedrijf 30 2 7 Veiligheids en bewakingscontroles 30 2 8 Vloeistoffen 30 2 9 Geluidsdruk 30 3 Algemene beschrijving 31 3 1 Toepassing 31 3 2 Toepassingswijzen 31 3 3 Opbouw 31 4 Verpakki...

Page 27: ...he eindcontrole Een door HOMA Pumpenfabrik GmbH gehonoreerde fabrieksgarantie be tekent niet dat de garantietijd wordt verlengd of dat er een nieuwe garantietijd ingaat voor de vervangen onderdelen Ve...

Page 28: ...een vloeistof aanwezig om te verpompen Opstellingswijze nat De pomp wordt in de vloeistof ondergedompeld De pomp is compleet omgeven door vloeistof Houd rekening met de gegevens voor de max dompeldiep...

Page 29: ...iligd tegen op nieuw inschakelen Alle draaiende onderdelen moe ten tot stilstand gekomen zijn De bediener moet elke optredende storing onmiddel lijk melden aan zijn leidinggevende Een onmiddellijke st...

Page 30: ...draaiende onderdelen tot stilstand komen 2 7 Veiligheids en bewakingscontroles Onze installaties zijn uitgerust met verschillende veilig heids en bewakingscontroles Deze inrichtingen mogen niet worden...

Page 31: ...ecompensatiering 800 mm Toe te passen pompmodellen TP30M TP30V TP50M TP50V TCV TCM GRP Toe te passen besturingskasten PS15 PS25 4 Verpakking transport en opslag 4 1 Aanlevering Na ontvangst moet de ze...

Page 32: ...t een hijs werktuig voor de montage demontage kan worden gemonteerd waarmee de opstelplaats van de pomp zonder risico s bereikbaar is Het hijswerktuig moet een maximale draagkracht hebben die hoger is...

Page 33: ...at se vakkundig worden gelast Optioneel is het moge lijk dat u de schachtverlenging reeds volledig gelast ontvangt 5 4 Opdrijfbeveiliging De SKB 6 resp SKB 9 schachten zijn voor normale toe passingssi...

Page 34: ...ekker moeten voor gebruik op beschadiging worden gecontroleerd Het uiteinde van de aansluitkabel mag niet in water worden ondergedompeld omdat er anders water in de motoraansluitruimte kan komen Motor...

Page 35: ...contamineerd Er moet tevens op wor den gelet dat er geen gassen worden gevormd of aanwezig zijn die schadelijk zijn voor de gezondheid Bij letsel door vloeistoffen of gassen die schadelijk zijn voor d...

Page 36: ...f Klasse B 785x600x125 Max 3 schachtoplegringen DIN 4034 2 785x625x80 Gegoten schachtafdekking 700 Klasse A volgens DIN 19596 Ontluchtings kabelbuis inlaat Spoelaansluiting optioneel vac umbreker aans...

Page 37: ...Nedlerlands 37 Notizen Notes...

Page 38: ...38 Notizen Notes...

Page 39: ...39 Notizen Notes...

Page 40: ...edingte Kontaminierung des Ger tes toxisch nein ja welche Stoffe tzend nein ja welche Stoffe mikrobiologisch nein ja welche Stoffe explosiv nein ja welche Stoffe radioaktiv nein ja welche Stoffe sonst...

Page 41: ...the instruments toxic no yes substance corrosive no yes substance microbiological no yes substance explosive no yes substance radioactive no yes substance other substances no yes substance Legally bi...

Page 42: ...tourneren Contaminatie van het apparaat als gevolg van de toepassing giftig nee ja welke stoffen bijtend nee ja welke stoffen microbiologisch nee ja welke stoffen explosief nee ja welke stoffen radioa...

Page 43: ...43...

Page 44: ...x 49 0 2247 702 44 e Mail info homa pumpen de Internet www homa pumpen de Industriestra e 1 53819 Neunkirchen Seelscheid Telefon 49 0 2247 702 0 Fax 49 0 2247 702 44 e Mail info homa pumpen de Interne...

Reviews: