ASSEMBLY
36
BBS810SMART_400V
the connection plate in the same way
as the base track.
3.
Carriage Assembly
3.1
Placing the machine head
on the mounting support
Lift the machine head out of
the transport packaging and
place it on a stable and clean
surface..
NOTE
2 persons are necessary due
to the weight of the
component. Any
Contamination (particles,..)
could scratch the surfaces.
3.2
Completing the vertical
guide
Insert the 2 vertical posts into
the sliding guides..
3.3
Assemble frame parts
Assemble both vertical frame
parts (right, left-side) onto
the vertical posts using
screw/washer/spring-washer.
Summary of Contents for BBS810SMART 400V
Page 86: ...ZUBEH R ACCESSORIES HOLZMANN Maschinen GmbH www holzmann maschinen at 86 BBS810SMART_400V...
Page 87: ...ZUBEH R ACCESSORIES HOLZMANN Maschinen GmbH www holzmann maschinen at 87 BBS810SMART_400V...
Page 88: ...ZUBEH R ACCESSORIES HOLZMANN Maschinen GmbH www holzmann maschinen at 88 BBS810SMART_400V...
Page 89: ...ZUBEH R ACCESSORIES HOLZMANN Maschinen GmbH www holzmann maschinen at 89 BBS810SMART_400V...