
PLEASE NOTE : Before fastening in aluminium
structures, pre-drill struts using a 08 mm tip.
1. Position the entrance between the struts and
secure it, inserting:
2x M10 washer (3) in the top part
2x M10x260 screw (4)
2x PE cap 025 mm, finned (6)
2x PE nut cover (2) at the bottom, 2x
M10 washer (3)
2x M10x260 TORX screw (4), 2x PE cap (5)
PLEASE NOTE : It is advisable to only
secure the nuts and bolts permanently and
insert the caps once it has been checked
that all the elements have been positioned
correctly.
PE entrance PE nut cover M10
washer M10x260 TORX screw
PE cap
PE cap 025 mm, finned
Article no.
Quantity
Name
1
4
4
4
2
2
1
2
3
4
5
6