background image

× 

14

6

×

140

Ø 5 mm

11/19

SHELTER 324

×

254

58

INSTALL THE 

ROOF

 PURLINS AND 

ATTACH

 THEM WITH SCREWS.

RFB

Summary of Contents for Spielberg 91809072-1

Page 1: ... 35 12 450 50 20 5 70 4 50 6 140 1 4 40 M8 70 Ø 3 mm Ø 4 mm Ø 5 mm Ø 8 mm 55 4 40 1 19 SHELTER 324 254 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS ...

Page 2: ...4 MAKE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB1 A C D B AB CD 0 IFB2 ...

Page 3: ... 6 6 140 Ø 5 mm 3 19 SHELTER 324 254 4 ATTACH FOUNDATION BEAMS WITH SCREWS ...

Page 4: ...5 mm 4 19 SHELTER 324 254 LAY OUT THE BOTTOM LOGS ATTACH TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 7 3 BL 1 6 140 2 BL 1 B LG 5 1 BL 1 5 70 5mm A LG 5 ...

Page 5: ... 12 6 140 Ø 5 mm 5 19 SHELTER 324 254 9 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 3 LG 1 2 LG 2 1 LG 1 ...

Page 6: ...9 SHELTER 324 254 16 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK 3 LG 2 2 LG 3 1 TL 1 A LG 4 B LG 4 3 LOGS IN PLACE ...

Page 7: ... 12 6 140 Ø 5 mm 7 19 SHELTER 324 254 19 INSTALL THE FLOOR BEAMS AND ATTACH THEM WITH SCREWS FLB1 ...

Page 8: ... 22 5 70 Ø 4 mm 8 19 SHELTER 324 254 21 INSTALL THE FLOOR BEAMS AND ATTACH THEM WITH SCREWS FLB2 FLB3 ...

Page 9: ...9 19 SHELTER 324 254 30 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS 2 LG 1 2 LG 1 A LG 3 B LG 3 ...

Page 10: ... 6 6 140 Ø 5 mm 10 19 SHELTER 324 254 54 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS 14 LOGS IN PLACE 3 LG 3 3 TL 1 2 TL 1 2 LG 5 2 LG 4 A LG 2 A LG 1 B LG 2 B LG 1 ...

Page 11: ... 14 6 140 Ø 5 mm 11 19 SHELTER 324 254 58 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS RFB ...

Page 12: ... 231 4 50 12 19 SHELTER 324 254 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 14 SCREWS 7 INTO EACH NEXT SAWTHE LAST BOARDTO MAKE IT FIT 59 RB ...

Page 13: ... 175 4 50 13 19 SHELTER 324 254 76 14 SCREWS INTO THE FIRST FLOORBOARD 7 INTO EACH NEXT FB1 ...

Page 14: ...14 19 SHELTER 324 254 90 SAW THE FLOORBOARDS WHERE NEEDED FB2 ...

Page 15: ... 2 16 5 70 4 50 Ø 4 mm Ø 3 mm 15 19 SHELTER 324 254 ATTACH FLOOR REINFORCEMENTS INTO THE FLOORBOARDS AND FASCIA TRIMS INTO THE ROOF PURLINS 93 FR RF2 5 70 4 50 ...

Page 16: ... 45 4 40 Ø 3 mm 16 19 SHELTER 324 254 97 EAVES EDGES GO ON TOP OF THE ROOFING NOT INCLUDED RF1 EE FF2 FF1 FF2 ...

Page 17: ... 20 1 4x40 17 19 SHELTER 324 254 98 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB ...

Page 18: ... 12 M8 70 Ø 8 mm 18 19 SHELTER 324 254 99 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT WINDBOARD ...

Page 19: ...19 19 SHELTER 324 254 WHEN THE SLEEPING SHELTER IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100 ...

Reviews: