background image

7/24

Lubec / 

LUNA 40

11

SLIDE THE 

DOORS 

IN,

 

ATTACH THE 

HANDLES.

CDD2R

CDD2R

CW4R

LOGS

 IN PLACE

Summary of Contents for Lubec

Page 1: ...20 20 650 65 30 5 70 4 50 6 140 1 4X40 M8 90 3 mm 4 mm 5 mm 8 mm 140 4 40 1 24 Lubec LUNA 40 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS...

Page 2: ...KE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 2 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB1 A D...

Page 3: ...4 14 5 70 6 140 4 mm 5 mm 3 24 Lubec LUNA 40 ATTACH FOUNDATION BEAMS WITH SCREWS 3 6 140 5 70...

Page 4: ...c LUNA 40 LAY OUT THE BOTTOM LOGS ATTACH TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 4 2 BL 1 B LG 2 6 140 1 BL 1...

Page 5: ...6 5 70 4 mm 5 6 140 5 mm 5 24 Lubec LUNA 40 5 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 2 LG 1 1 LG 2 1 LG 3 1 LG 4 6 140 5 70...

Page 6: ...6 24 Lubec LUNA 40 10 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK...

Page 7: ...7 24 Lubec LUNA 40 11 SLIDE THE DOORS IN ATTACH THE HANDLES CDD2R CDD2R CW4R 4 LOGS IN PLACE...

Page 8: ...8 24 Lubec LUNA 40 17 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS HITBLOCK 1 LG 2 1 LG 1...

Page 9: ...9 24 Lubec LUNA 40 SLIDE THE WINDOW IN ATTACH THE HANDLE 18 CDW4 3 LOGS IN PLACE...

Page 10: ...10 24 Lubec LUNA 40 SLIDE THE WINDOWS IN 45 CW4R CW4L 1 LG 5...

Page 11: ...16 4 40 11 24 Lubec LUNA 40 INSTALL THE MIDDLE WINDOW INSERT CM1 BETWEEN THE WINDOWS AND ATTACH WINDOWS TO CM1 WITH SCREWS ATTACH THE HANDLES 46 CW4R CM1...

Page 12: ...16 4 40 12 24 Lubec LUNA 40 ATTACH LATHS LTH1 INTO WINDOWS AND INTO CM1 WITH SCREWS 47 LTH1 LTH1...

Page 13: ...6 6 140 5 mm 13 24 Lubec LUNA 40 51 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS GABLE 2 TL 1 19 LOGS IN PLACE 1 TL 1 B LG 7...

Page 14: ...9 6 140 5 mm 14 24 Lubec LUNA 40 53 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS RFB RFR...

Page 15: ...348 4 50 15 24 Lubec LUNA 40 54 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 6 SCREWS 3 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT RB...

Page 16: ...81 52 4 40 16 24 Lubec LUNA 40 FOR THE FASCIA TRIMS INSERT SCREWS AFTER EVERY 0 5 METERS RR2 RR1...

Page 17: ...32 4 40 3 mm 17 24 Lubec LUNA 40 EAVES EDGES GO ON TOP OF THE ROOFING NOT INCLUDED 83 RF EE...

Page 18: ...4 4 40 18 24 Lubec LUNA 40 84 ATTACH ROMBS WITH SCREWS ROMB...

Page 19: ...266 4 50 19 24 Lubec LUNA 40 85 14 SCREWS INTO THE FIRST FLOORBOARD 7 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT FB...

Page 20: ...30 1 4 40 20 24 Lubec LUNA 40 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB...

Page 21: ...20 M8 90 8 mm 21 24 Lubec LUNA 40 97 DRILL THROUGH THE WALL HOLES MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT WINDBOARD...

Page 22: ...90 90 22 24 Lubec LUNA 40 98 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90...

Page 23: ...23 24 Lubec LUNA 40 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Page 24: ...24 24 Lubec LUNA 40 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Reviews: