ELISABETH 28

99

%

IF

 DOORS 

ARE IN DIFFERENT HEIGHTS

OR THERE IS A GAP 

BETWEEN

 THEM,

ADJUST

 3 SCREWS ON DOOR HINGES.

Summary of Contents for ELISABETH 28

Page 1: ...60 15 12 510 35 30 4 40 5 70 4 50 6 140 1 4 40 M8 60 3 mm 4 mm 5 mm 8 mm 1 20 ELISABETH 28 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS...

Page 2: ...28 MAKE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB...

Page 3: ...20 ELISABETH 28 LAY OUT THE BOTTOM LOGS ATTACH TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 5 2 BL 1 6 140 1 BL 1 1...

Page 4: ...4 5 70 4 mm 5 6 140 5 mm 4 20 ELISABETH 28 7 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 2 LG 6 1 LG 5 1 LG 5 6 140 5 70...

Page 5: ...5 20 ELISABETH 28 12 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK...

Page 6: ...6 20 ELISABETH 28 13 SLIDE THE DOOR IN ATTACH THE HANDLE BDD5R 3 LOGS IN PLACE...

Page 7: ...7 20 ELISABETH 28 26 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS 1 LG 2 1 LG 5 1 LG 1...

Page 8: ...8 20 ELISABETH 28 SLIDE THE WINDOW IN ATTACH THE HANDLE 28 BW1L BW1R...

Page 9: ...4 6 140 5 mm 9 20 ELISABETH 28 42 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS 15 LOGS IN PLACE GABLE A TL 1 B TL 1 B LG 2 A LG 2...

Page 10: ...10 6 140 5 mm 10 20 ELISABETH 28 43 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS RFR RFB...

Page 11: ...272 4 50 11 20 ELISABETH 28 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 6 SCREWS 3 INTO EACH NEXT SAWTHE LAST BOARDTO MAKE IT FIT 46 RB...

Page 12: ...32 4 40 12 20 ELISABETH 28 79 FOR THE FASCIA TRIMS INSERT SCREWS AFTER EVERY 0 5 METERS RR1 RR2...

Page 13: ...40 4 40 3 mm 13 20 ELISABETH 28 83 EAVES EDGES GO ON TOP OF THE ROOFING NOT INCLUDED RF EE...

Page 14: ...4 4 40 3 mm 14 20 ELISABETH 28 84 ATTACH ROMBS WITH SCREWS ROMB...

Page 15: ...216 4 50 15 20 ELISABETH 28 89 12 SCREWS INTO THE FIRST FLOORBOARD 6 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT FB...

Page 16: ...30 1 4 40 16 20 ELISABETH 28 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB...

Page 17: ...12 M8 60 8 mm 17 20 ELISABETH 28 97 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT 4CM 20CM WINDBOARD...

Page 18: ...90 90 18 20 ELISABETH 28 98 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90...

Page 19: ...19 20 ELISABETH 28 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Page 20: ...20 20 ELISABETH 28 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Reviews: