background image

× 

20

1,4

×

40

14/18

ANNIKA I 28

96

%

SAW THE 

BASEBOARDS

AND ATTACH WITH NAILS

AT 

EVERY 0,5

 METERS.

BB

Summary of Contents for Annika I 28

Page 1: ...60 15 12 295 25 20 4 40 5 70 4 50 6 140 1 4 40 M8 60 3 mm 4 mm 5 mm 8 mm 1 18 ANNIKA I 28 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS...

Page 2: ...8 MAKE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB A...

Page 3: ...18 ANNIKA I 28 LAY OUT THE BOTTOM LOGS ATTACH TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 5 2 BP 1 6 140 1 BP 1 1...

Page 4: ...4 5 70 4 mm 4 6 140 5 mm 4 18 ANNIKA I 28 7 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 2 LG 1 1 LG 1 1 LG 1 6 140 5 70...

Page 5: ...5 18 ANNIKA I 28 12 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK...

Page 6: ...6 18 ANNIKA I 28 13 SLIDE THE DOOR IN ATTACH THE HANDLE BDD1R 3 LOGS IN PLACE...

Page 7: ...7 18 ANNIKA I 28 26 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS...

Page 8: ...8 6 140 5 mm 8 18 ANNIKA I 28 42 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS 16 LOGS IN PLACE 1 TL 1 A LG 1 B LG 2 B LG 4 A LG 2 A LG 4 B LG 1 2 TL 1...

Page 9: ...2 6 140 5 mm 9 18 ANNIKA I 28 43 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS RFB...

Page 10: ...93 4 50 10 18 ANNIKA I 28 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 6 SCREWS 3 INTO EACH NEXT SAWTHE LAST BOARDTO MAKE IT FIT 46 RB...

Page 11: ...28 4 40 11 18 ANNIKA I 28 79 FOR THE FASCIA TRIMS INSERT SCREWS AFTER EVERY 0 5 METERS RR3 RR1...

Page 12: ...20 4 40 3 mm 12 18 ANNIKA I 28 83 EAVES EDGES GO ON TOP OF THE ROOFING NOT INCLUDED EE RR2...

Page 13: ...104 4 50 13 18 ANNIKA I 28 89 8 SCREWS INTO THE FIRST FLOORBOARD 4 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT FB...

Page 14: ...20 1 4 40 14 18 ANNIKA I 28 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB...

Page 15: ...12 M8 60 8 mm 15 18 ANNIKA I 28 97 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT 20CM 4CM WINDBOARD...

Page 16: ...90 90 16 18 ANNIKA I 28 98 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90...

Page 17: ...17 18 ANNIKA I 28 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Page 18: ...18 18 ANNIKA I 28 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Reviews: