LAY OUT THE 

BOTTOM

 LOGS, 

ATTACH

 TO THE FOUNDATION.

THE WALL 

LOGS

 WILL HANG OVER 

THE FOUNDATION 

BEAMS

 BY 

APPROXIMATELY

 5MM. THIS OVERHANG 

IS DESIGNED AS A RAIN DRIP.

  

5

%

2 BL-1

6

×

140

1 BL-1

1 BL-2

A LG-2

B LG-1

5

×

70

5mm

Summary of Contents for Alsberg 4200011-1

Page 1: ...15 16 850 70 30 5 70 4 50 6 140 1 4X40 M8 70 3 mm 4 mm 5 mm 8 mm 120 4 40 1 21 GNESTA 40 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS...

Page 2: ...KE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB1 A C...

Page 3: ...18 6 140 3 21 GNESTA 40 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER 4...

Page 4: ...4 21 GNESTA 40 LAY OUT THE BOTTOM LOGS ATTACH TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 5 2 BL 1 6 140 1 BL 1 1...

Page 5: ...4 5 70 4 mm 4 6 140 5 mm 5 21 GNESTA 40 7 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 2 LG 9 1 LG 2 1 LG 5 6 140 5 70...

Page 6: ...6 21 GNESTA 40 12 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK...

Page 7: ...7 21 GNESTA 40 13 SLIDE THE DOOR IN ATTACH THE HANDLE CDD1 3 LOGS IN PLACE...

Page 8: ...8 21 GNESTA 40 26 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS HITBLOCK 1 LG 2 A LG 1 1 LG 1...

Page 9: ...9 21 GNESTA 40 SLIDE THE WINDOW IN ATTACH THE HANDLE 28 CDW1 CW1R...

Page 10: ...8 6 140 5 mm 10 21 GNESTA 40 42 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS 18 LOGS IN PLACE GABLE2 GABLE2 GABLE1 A TL 1 B TL 1 GABLE 1...

Page 11: ...10 6 140 5 mm 11 21 GNESTA 40 43 INSTALL THE ROOF PURLINS AND ROOF ELEMENTS 1 ATTACH THEM WITH SCREWS RFR RFR RFR RFB...

Page 12: ...475 4 50 12 21 GNESTA 40 84 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH SCREWS SAWTHE LAST BOARDTO MAKE IT FIT RB2 RB1...

Page 13: ...44 4 40 13 21 GNESTA 40 85 FOR THE FASCIA TRIMS INSERT SCREWS AFTER EVERY 0 5 METERS RR1 RR2...

Page 14: ...52 4 40 3 mm 14 21 GNESTA 40 87 EAVES EDGES GO ON TOP OF THE ROOFING NOT INCLUDED RF2 EE2...

Page 15: ...15 21 GNESTA 40 4 4 40 3 mm 88 ATTACH ROMBS WITH SCREWS ROMB...

Page 16: ...16 21 GNESTA 40 297 4 50 3 mm 89 18 SCREWS INTO THE FIRST FLOORBOARD 9 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT...

Page 17: ...30 1 4x40 17 21 GNESTA 40 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB...

Page 18: ...16 M8 70 8 mm 18 21 GNESTA 40 97 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT 4CM 20CM WINDBOARD...

Page 19: ...90 90 19 21 GNESTA 40 98 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90...

Page 20: ...20 21 GNESTA 40 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Page 21: ...21 21 GNESTA 40 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Reviews: