
Thanks for being a
#SMARTGARDENER
We really appreciate having you as a customer, and
would like to say thank you for choosing us.
We recommend registering your new product on our website.
This will ensure we have a copy of your purchase and activate
an extended warranty. Keep up to date to with relevant product
information and special offers available through our newsletter.
www.holmanindustries.com.au/product-registration/
Thanks again for choosing Holman
Assembly Continued
Step 8
Step 9
Step 10
Repeat
Steps 7 - 8
until all of the
Frame Hangers
have
been placed on the poles. Place one set of
Frame Clips
and one
Frame Hanger
on the grooves at one time.
Step 11
Irrigation Assembly
Step 1
Unwind the
Pre-Assembled Irrigation Kit
and place into
the
GreenWall
®
Pots
with the below configuration. This is
to ensure even water distribution between the pots.
Step 2
Make sure the dripper is placed in the middle of the
GreenWall
®
Pots
,
using the grooves on the back of the pots, push the tubing into place.
Optional: Use cable ties to secure the tubing around the poles.
Step 3
Step 4
For further instructions and tutorials,
head to our YouTube Channel!
l.