Instructions
– 4097M
For Technical Support Call: 800-343-7486, Monday-Friday, 7AM - 4 PM (PST)
Page 6
Step 2 – Install Torque Tube
Place torque tube in between the two bows.
Be sure both ladder pans are COMPLETELY resting on the bows as shown.
Bolt torque tube to each bow using three 1/4" x 7/8
” hex head bolts, six 1/4” flat washers and three
1/4" nyloc nuts.
Repeat on front and rear bow.
DO NOT TIGHTEN at this point.