A S S E M B LY
I N S T R U C T I O N S
F R A M E A S S E M B L Y
In this step, start by attaching the Cross Tube Assembly to the Weight Cage,
then attach the Seated frame to the Cross Tube Assembly and the Weight Cage.
Next insert the Bearings (BF) in the Extension Tube Assembly then align the Shin
bar Assembly to the Bearings and secure. Make sure to put zerk fitting facing
down.
bolts only, they will be tightened later.
Hand Tighten
Lift Machine to
position Rubber Feet.
Step 2b
5 - Shin Bar Assembly
8 - Seated Frame Assembly
9 - Cross Tube Assembly
13 - Shaft
23 - Rubber Foot Pad
Part Descriptions
A - 1/2” x 1 1/2” Button Head Screw
H - 3/8-16” x 1” Button Head Screw
N - 1/2” Lock Washer
P - 1/2” Flat Washer
T - 3/8” Internal Lock Washer
AJ - 1/2” Insert
AR - Flange Bearing (014-0008004)
BE - 3/8” Flat Washer
Hardware Descriptions
FITNESS SYSTEMS
R
HOIST
Page - 7
2408 Assembly
Summary of Contents for CL-2408
Page 4: ...FITNESS SYSTEMS R HOIST Page 3 2408 Assembly A S S E M B LY I N S T R U C T I O N S ...
Page 19: ...A S S E M B LY I N S T R U C T I O N S 2408 Assembly Page 18 FITNESS SYSTEMS R HOIST 19 Y 32 ...
Page 24: ...Page 23 2408 Assembly OW N E R S M A N U A L FITNESS SYSTEMS R HOIST ...
Page 28: ...FITNESS SYSTEMS R HOIST Page 27 2408 Assembly OW N E R S M A N U A L ...
Page 30: ...Page 29 2408 Assembly FITNESS SYSTEMS R HOIST OW N E R S M A N U A L ...
Page 32: ...OW N E R S M A N U A L FITNESS SYSTEMS R HOIST 2408 Assembly Page 31 ...
Page 40: ...Page 39 2408 Assembly FITNESS SYSTEMS R HOIST OW N E R S M A N U A L ...