A S S E M B LY
I N S T R U C T I O N S
F R A M E A S S E M B L Y
Step 2a
FITNESS SYSTEMS
R
HOIST
1 - Seated Assembly
2 - Weight Cage
3 - Rubber Foot Pad
4 - 2”x 4” End Caps
6 - Shaft
(VH)
(1/2”Dia. x 1.240 LG.)
Part Descriptions
A - 1/2”-13 x 1 1/2” Button Head Screw
B - 5/16”-18 x 2” Button Head Screw
AA - 1/2” Lock Washer
AB - 1/2” Flat Washer
AM - 5/16” Flat Washer
CA - Plug Bumper
CG - Insert 1/2”
CP - Insert 3/8”
CT - 3/4” Olite
(White Zinc)
(White Zinc)
(White Zinc)
(White Zinc)
(White Zinc)
Hardware Descriptions
2407 Assembly
Page 5
(
) Insert (CG) and (CP) into (1) and (2). Attach
(1) to (2). Then insert (6) into (1). Next attach (CA) and (4) to the rear
of (1).
bolts only, they will be tightened later. Lift machine
to position (3).
Factory Installation
Hand tighten
Summary of Contents for CL-2407
Page 4: ...FITNESS SYSTEMS R HOIST 2407 Assembly Page 3 A S S E M B LY I N S T R U C T I O N S ...
Page 23: ...12 CD 26 FITNESS SYSTEMS R HOIST 2407 Assembly Page 22 A S S E M B LY I N S T R U C T I O N S ...
Page 29: ...OW N E R S M A N U A L 2407 Assembly Page 28 FITNESS SYSTEMS R HOIST ...
Page 31: ...OW N E R S M A N U A L 2407 Assembly Page 30 FITNESS SYSTEMS R HOIST ...
Page 33: ...FITNESS SYSTEMS R HOIST 2407 Assembly Page 32 OW N E R S M A N U A L ...
Page 39: ...FITNESS SYSTEMS R HOIST 2407 Assembly Page 38 OW N E R S M A N U A L ...
Page 42: ...FITNESS SYSTEMS R HOIST 2407 Assembly Page 41 OW N E R S M A N U A L ...