Summary of Contents for MS400-2
Page 2: ......
Page 15: ...8 Press to confirm 9 Press to cancel self diagnostics in any phase ...
Page 17: ...4 Press 5 Press 6 Press 7 Press ...
Page 20: ...16 Refit the weight tray 17 Calibrate the automatic gauges ...
Page 23: ...8 Refit the weight tray 9 Calibrate the automatic gauges ...
Page 28: ...8 Open the guard 9 Tighten the second grub screw 10 Fit the spring 11 Fitted guard ...
Page 29: ...12 SONAR WIDTH If present connect the cable to the relative connector on the rear of the base ...
Page 33: ...4 To refit it operate in reverse order from removal ...
Page 36: ...8 To refit perform the operations in reverse order ...
Page 43: ...18 Reconnect the tube and open the compressed air 19 Open the spindle 20 Tighten the 3 screws ...
Page 44: ...21 Close the spindle 22 Remove the shim 23 Reconnect the potentiometer cables ...
Page 45: ...24 Refit the encoder Refit the weight tray ...
Page 50: ...12 Replace the piezo sensors 13 Position the static piezo 14 Position the dynamic piezo ...
Page 61: ...4 Press 5 Press 6 Press 7 Press ...
Page 63: ...12 End of calibration ...
Page 70: ...4 Press 5 Press 6 Press 7 Press ...
Page 72: ...12 Calibration done ...
Page 74: ...4 Press 5 Press 6 Press 7 Press ...
Page 82: ...4 Check that the distance measured is 212 3 ...
Page 84: ...3 If the belt tension is correct the motor pulley must not turn ...
Page 91: ...8 Discharge the piezo sensors before connecting them to the electronic circuit ...
Page 97: ...VDD UNIT REFASTENING Model M400 2 C M400P 2 C M400P 2 D SHEET 028 ...
Page 99: ...4 Remove the motor 5 Remove the belt 6 Replace the belt ...
Page 102: ...POWER LAYOUT DIAGRAM Model M400 2 C M400P 2 C SHEET 030 ...
Page 103: ...POWER LAYOUT DIAGRAM Model M400P 2 D SHEET 030 ...
Page 104: ......