HODEDAH
®
www.Hodedah.com
Step 8
20
H-PROFILE (PVC)
1 Pc.
17
Nail
84 Pcs.
10
Pvc Dowel
Place 3 back Panels
T
onto the back of the main unit, and join 2 panels
T
together with
H-profile by slotting one side each of panel T into the track of H-profile. Then align them
properly for nailing.
Then use hammer to nail the nails one by one and at center of 4 side edges. Gap between 2
nails should be about 100mm for all.
Cover all the screws
⑧
and
⑨
’
head with PVC
cap
⑩
provided by
pushing co
ver’s
stem
onto the hole of screw
heads one by one for all
screws.