ASSEMBLY INSTRUCTIONS
PAGE 2 OF 3
NOTE : MUST TIGHTEN SCREWS PERIODCALLY.SCREW NATURALLY LOOSEN WITH USE.CHECK TIGHTNESS OF ALL SCREW EVERY 6-8 WEEKS.
D
Attach the Center Slat Drawer ( E ) to Side Rail ( D ) as shown using
CSK Screw ( 5 ) and tighten with Screw Driver.(Not Included)
STEP 3 :
E
D
E
5
Attach the Drawer Support Rail ( J ) as shown using CSK Screw ( 5 ) and
tighten with Screw Driver.(Not Included)
E
Attach the Support Slat Drawer ( H ) to Center Slat Drawer ( E ) as shown using
JCBC Bolt ( 11 ) and tighten with ALLEN KEY ( 9 ).
STEP 4 :
H
H
9
11
5
J
9
6
7
8
STEP 5 .1 :
STEP 5 .2 :Using JCBC Bolt ( 6 ) with Spring Washer ( 7 ),Flat Washer ( 8 ) and securing
with ALLEN KEY ( 9 ).
J
J
STEP 6 .1 :Insert the Drawer ( L ) at the Drawer Support Rail ( J ).
L
x2
x2
x2
Cut of the Raffia String from the back of DRESSER ( B ).
STEP 1 :
Turn the MIRROR SUPPORT RAIL (C) upward at the back of DRESSER (B), then
Tighten with CSK SCREW (D). Place the MIRROR FRAME (A) on the top
of DRESSER (B). Tighten with CSK Screw (D).
STEP 2 :
ASSEMBLY INSTRUCTIONS
B
C
D
C
C
NO
ITEM
QTY
A
MIRROR
1 PC
BOX OF MIRROR
(BOX 1)