E
strella
S
port
13
□
step1
Locate the following items included in the hardware pack.
□
step 2
The main landing gear is mounted to the bottom of the fuselage using three M3*12 Socket Head Cap Screw
and three
Φ
3.1mm Flat Washer. Apply a drop of threadlock on each of the screws. Use a 3mm hex wrench to
tighten the screws to secure the landing gear to the bottom of the fuselage.
□□
step 3
Attach the wheel axle to the landing gear using a 7/16-inch box wrench (axle) and 1/2-inch box wrench (nut).
Make sure the nut on the axle side aligns with the landing gear as shown in the photo so the wheel pant can
be installed.
□□
step 4
Attach a
Φ
4.1*10mm Wheel Collars to the axle using a 3mm x 5mm set screw. Make sure to apply threadlock
to the screw so it will not vibrate loose. Position the collar so it is 7.5mm from the landing gear as shown and
use a #2 Phillips screwdriver to tighten the screw on the flat area of the axle. The position of the wheel may
need to be fine-tuned in the last step of this section.