Electrical Installations
06-5
12 V - Distribution panel
Heating/Boiler
Light B
Light A
Pump
Entrance step
Aux.
Gas consumers
Refrigerator
D+/Exter
nal lighting
Connection
fresh water probe
Connection
sewage probe
Connection
battery charger
1/8 free
2/8 LED green
3/8 LED red
4/8 12V mains
5/8 + charge
6/8 Plus charge
7/8 Earth
8/8 Earth
Connection
display panel
Connection
earth consumers
Connection
pump switch
Connection
D+ generator
Connection
earth
Connection
battery II
Connection
battery I
Reserved for 9-pole plug
1/9 Heating/Boiler via main switch protected by fuse1
2/9, 5/9, 4/9 Light B via main relay protected by fuse2
3/9 Pump switched by relay protected by fuse4
6/9 External lighting / D+ increased automatic change-over via +, protected by fuse9
7/9, 8/9, 9/9 Light A via main relay protected by fuse3
Reserved for 6-pole plug
1/6 Entrance step continuous, protected by fuse5
2/6, 3/6 Refrigerator D+ controlled, protected by fuse8
4/6 Aux. continuous, protected by fuse6
5/6, 6/6 Gas consumers continuous, protected by fuse7
B2 permanently connected to refrigerator when connections
KS1 and KS2 bypassed (no longer controlled via D+)
D+ signal switched via relay
Pump
relay
Main relay
Parallel
connection relay
Refrigera-
tor relay
D+/Ext.
lighting
relay
KS2
KS1
FWT
AWT
Display
Earth
Char
ger
Pump
D+
Summary of Contents for 555 FS
Page 7: ...Introduction ...
Page 8: ...Safety ...
Page 23: ...Chassis ...
Page 33: ...Chassis ...
Page 34: ...Wheels tires brakes ...
Page 42: ...Wheels tires brakes ...
Page 43: ...Exterior Structure ...
Page 53: ...Exterior Structure ...
Page 54: ...Electrical Installations ...
Page 67: ...Electrical Installations 06 13 6 7 Interior circuit diagram T555 AK LC T555 AK SC ...
Page 68: ...Electrical Installations 06 14 T555 AK LC T555 AK SC ...
Page 69: ...Electrical Installations 06 15 T555 FS u AK ...
Page 70: ...Electrical Installations 06 16 T555 FS u AK ...
Page 71: ...Electrical Installations 06 17 T600 FC ...
Page 72: ...Electrical Installations 06 18 T600 FC ...
Page 73: ...Electrical Installations 06 19 T600 GFLC AK ...
Page 74: ...Electrical Installations 06 20 T600 GFLC AK ...
Page 75: ...Electrical Installations 06 21 T600 GFS ...
Page 76: ...Electrical Installations 06 22 T600 GFS ...
Page 77: ...Electrical Installations 06 23 T650 AK KLC ...
Page 78: ...Electrical Installations 06 24 T650 AK KLC ...
Page 79: ...Electrical Installations 06 25 T650 FLC u AK ...
Page 80: ...Electrical Installations 06 26 T650 FLC u AK ...
Page 81: ...Electrical Installations 06 27 T650 GFLC u AK ...
Page 82: ...Electrical Installations 06 28 T650 GFLC u AK ...
Page 84: ...Electrical Installations ...
Page 85: ...Electrical Installations ...
Page 98: ...Electrical Installations 06 13 6 7 Interior circuit diagram T555 AK LC T555 AK SC ...
Page 99: ...Electrical Installations 06 14 T555 AK LC T555 AK SC ...
Page 100: ...Electrical Installations 06 15 T555 FS u AK ...
Page 101: ...Electrical Installations 06 16 T555 FS u AK ...
Page 102: ...Electrical Installations 06 17 T600 FC ...
Page 103: ...Electrical Installations 06 18 T600 FC ...
Page 104: ...Electrical Installations 06 19 T600 GFLC AK ...
Page 105: ...Electrical Installations 06 20 T600 GFLC AK ...
Page 106: ...Electrical Installations 06 21 T600 GFS ...
Page 107: ...Electrical Installations 06 22 T600 GFS ...
Page 108: ...Electrical Installations 06 23 T650 AK KLC ...
Page 109: ...Electrical Installations 06 24 T650 AK KLC ...
Page 110: ...Electrical Installations 06 25 T650 FLC u AK ...
Page 111: ...Electrical Installations 06 26 T650 FLC u AK ...
Page 112: ...Electrical Installations 06 27 T650 GFLC u AK ...
Page 113: ...Electrical Installations 06 28 T650 GFLC u AK ...
Page 115: ...Electrical Installations ...
Page 116: ...Water ...
Page 129: ...Gas ...
Page 138: ...Accessories ...
Page 140: ...Accessories ...
Page 141: ...Maintenance and Care ...
Page 148: ...Sanitation and Environmental Protection ...
Page 152: ...Sanitation and Environmental Protection ...
Page 153: ...Technical Data ...
Page 156: ...Index ...
Page 159: ...Appendix ...