Install (1) Tail pulley gear onto tail out
put shaft and inter locking pin into the
pulley gear.
Install (1) Pulley Gear side plate onto
the pulley gear/shaft assembly with
reduced portion of the plate away from
the gear.
Install (1) Tail Drive Belt around the
pulley gear and through the boom.