OM-279 Page 12
2-8.
Placing Jumper Links
Check input voltage available at
site.
1
Jumper Link Label
Move jumper links to match input
voltage and label on unit.
Ref. 801 455
S-094 120-B
230 Volts
460 Volts
575 Volts
L1
L2
L3
L1
L2
L3
L1
L2
L3
3/8 in
Tools Needed:
230 VOLTS
460 VOLTS
200 VOLTS
S-083 566-C
L
L
L
L
L
L
1
Do not overtighten.
Single-Phase Models
Three-Phase Models