OM-283007 Page 12
SECTION 5
−
INSTALLATION
5-1. Selecting A Location
!
Special installation may be
required where gasoline or
volatile liquids are present
−
see NEC Article 511 or CEC
Section 20.
!
Do not move or operate unit
where it could tip.
1
Grounded Receptacle
Locate unit near correct input
power supply.
161062
18 in.
(460 mm)
18 in.
(460 mm)
1
5-2. Installing Work Clamp
.
Connection hardware must be tight-
ened with proper tools. Do not just
hand tighten hardware. A loose
electrical connection will cause
poor weld performance and exces-
sive heating of the work clamp.
1
Work Clamp
2
Work Cable From Unit
3
Insulator Grip
Slide one insulating grip over work cable
before connecting to clamp.
4
Nut
5
Lock Washer
6
Flat Washer
7
Screw
8
Work Clamp Tabs
Bend tabs around work cable.
Slide insulating grips over handles.
Ref. 802456
4
2
1
7
8
Tools Needed:
10 mm
3
5
6
3