OM-249 818 Page 9
1. Close the cylinder valve.
2. Open the valve on the downstream equipment to release all pres-
sure from the system.
3. Close the valve on the downstream equipment after the system
pressure has been released.
4. Turn adjusting handle counterclockwise to release the tension on
the adjusting spring.
5. After a few minutes, check the gauges on the regulator to ensure
the cylinder valve has been completely closed.
6. If necessary, remove regulator from cylinder. Reinstall cap on cyl-
inder.
9. When Finished Using The Regulator
Hobart cutting and welding equipment will have a long service life when
properly installed, operated, and maintained. The working conditions and
servicing each individual gives this equipment will also impact the service
life. Check the equipment frequently and repair, reset, or replace as neces-
sary for continued safe and reliable performance.
10. Statement Of User Responsibilities