Verify Operation
When the installation and configuration are completed, verify that the router is
in operation.
Fig. 2
LED Indicators
Front Panel LED
LED
Status
Description
PWR
Green On
DC-IN Power is On
Off
No Power in DC-IN
SYS
System LED
Green On
Ready
Green Blinking
Firmware Updating
Off
Not Ready
DO
Alarm
Red On
Any failure in port link by SW control
Off
No failure occurs
1000 M
WAN
Green On
WAN port speed is 1 Gbit/s
Off
WAN port speed is not 1 Gbit/s
Port 9
WAN
Green On
Link is established
Green Blinking
Packets transmitting/receiving
Anybus
®
Industrial WLAN/LTE Router Startup Guide
SP2557 1.11 en-US