HMF Leofant 32 ABB2570 Instruction Manual Download Page 1

© HMF, 48336 Sassenberg-Füchtorf

 

Page 1 

 

 

 

 
 
 
 

Instruction manual 

 

Dam-former  

LEOFANT 32 ABB2570 

 

 
 
 
 
 

Producer 

HMF Hermeler Maschinenbau GmbH 

Lohmannstr.4 

– 48336 Sassenberg-Füchtorf 

Telefon:0049 (0) 54 26 / 53 84 

Fax: 0049 (0) 54 26 / 53 85 

E-Mail: [email protected] 

Internet: www.hmf-hermeler.de 

 

 
 

Summary of Contents for Leofant 32 ABB2570

Page 1: ...Instruction manual Dam former LEOFANT 32 ABB2570 Producer HMF Hermeler Maschinenbau GmbH Lohmannstr 4 D 48336 Sassenberg F chtorf Telefon 0049 0 54 26 53 84 Fax 0049 0 54 26 53 85 E Mail info hmf her...

Page 2: ...ber 2 Type 3 Construction year Machine number type and construction year are hammered into the identification plate at the right front side of the machine Descriptions left or right are always meant i...

Page 3: ...ty 8 5 Using possibilities 8 6 Functioning 8 7 Starting up 9 7 1 Mounting to the tractor 9 7 1 1 Adjustments 9 7 2 Milling of an asparagus dam 9 7 3 Reworking of the asparagus dam 12 8 Maintenance and...

Page 4: ...s cultivation then your Leofant will always perform good work 2 General Remarks 2 1 Attention All people who would use care or control the dam former Leofant have to read comprehend and pay attention...

Page 5: ...on It is not allowed to stay in the dangerous area Before every use do switch the handles for the lifter and the PTO shaft to 0 Approximately 10 hours after starting up you have to check and if necess...

Page 6: ...ecurity advices before starting on In case of all maintenance and working of repairs stop the motor and remove the ignition key Don t stay in the working area while using the lifter While using the ma...

Page 7: ...rg F chtorf Page 7 There is danger of contusion Caution There is danger of hurled out pieces while machine is running Pay attention to keep a safe distance to the machine Don t stay in the swerving ar...

Page 8: ...used only as agreed You can build with the dam former Leofant in one or in several processes asparagus dams This machine is also suitable for re building the dams during the harvesting season 6 Funct...

Page 9: ...els behind the tractor You have fix the lower links in that way that while working on the field a tolerance of 1 cm on both sides is possible Now put on the PTO shaft The minimum covering of the profi...

Page 10: ...the dam With another spindle image 3 pos 2 and 3 you can adjust the compression inside the dam The front tins optional should have been adjusted in a position to loosen and level the area directly be...

Page 11: ...supporting wheels now each one turn higher Now you should check the form of the dam again A further modification of the dam height has now to happen simultaneously at the adjustment for the wheels ima...

Page 12: ...ructions to work successful with it The lower end of this triangle should be adjusted approx 2 5 cm above the edge of the dam former Nr 2 By having this adjustment the triangle is able to spread the s...

Page 13: ...ntal the spring tines must be adjusted so that the upper layer of dry sand trickles down to the dam sole The following spike drums mix the dry ground when raising the dams with damp soil and there res...

Page 14: ...ave to been absolutely respected The lubrication points image 4 1 and 2 and the PTO shaft have to been lubricated every 20 hours Image 4 While re lubrication there might get some lubricant into the so...

Page 15: ...propulsion for the driving and for the rotors Every 20 working hours you also have to check this for leakage and filling quantity The quantity of the oil is enough when you can see the oil in the loo...

Page 16: ...FANT Standard PLEASE PAY ATTENTION Dam former in moving direction right You have to see the screw with the bolt Dam former in moving direction left You have to see the heads of the screws Please tight...

Page 17: ...t 32 2570 to which this declaration refers is satisfying the relevant elementary requirements of security and health of the EG directive 89 392 EWG in the version of the third modified directive 93 68...

Reviews: