background image

14.

 If you do not wish to activate the false front functionality, 

do not carry out this step. To activate false front functionality, 

stick your hand past shutter seal and into bin to attach the 

shutter stop.

13.

 With bin in the same position, click shutter stop into 

place in its hinges. Make sure shutter stop is installed in a 

way that places the encircled plastic grip on inside of the 

bin.

3eBin

 

- Gravity bin assembly instructions

10.

 On a flat surface, position the two halves of the body as above. Fit the protruding pods at the back of the left bin 

body into the corresponding, square openings you can see at the back of the right bin body. Then move the rest of the 

left and right bin body towards each other.

11.

 Ensure shutter seal is inserted into 

the other bin body half as well.

12.

 When eventually connecting both body halves, make sure latches click 

into each other. There are 8 latches in total - 2 large ones, 6 small ones.

Plastic grip

Protruding pods

Square openings

Latches

Latches

4

Summary of Contents for 3eBin

Page 1: ...ssembly instructions 2 3 6 4 5 13 14 7 11 12 Components 1 Front 9 Bearings 2 pcs 2 Left bin body 10 Plugs 2 pcs 3 Right bin body 11 Sleeve 4 Label holder 12 Handle 5 Springs 2 pcs 13 Shutter seal 6 Clip 14 Shutter 7 Shutter stop 15 Top lid 8 Flow control ...

Page 2: ...oth springs 3 Lay bin front on a flat surface Grab shutter There are four pegs on the shutter in total the two pegs to which the springs are attached should be the ones closest to you Insert shutter into bin front with protruding circles entering front first Push sides of shutter slightly inwards in order to make the shutter squeeze past sides of front Click protruding circles into the correspondi...

Page 3: ...e nozzle until the shutter s holes overlap with handle s holes Click plugs into the holes in the sides of front securing the handle to the front Do this for both plugs Make sure you hear one click per plug being attached if not keep trying by pushing the front and the shutter together using both hands as shown in the right picture above 7 Slide sleeve over top the nozzle with the part of the sleev...

Page 4: ...avity bin assembly instructions 10 On a flat surface position the two halves of the body as above Fit the protruding pods at the back of the left bin body into the corresponding square openings you can see at the back of the right bin body Then move the rest of the left and right bin body towards each other 11 Ensure shutter seal is inserted into the other bin body half as well 12 When eventually ...

Page 5: ...ture above flow control is set to the largest flow possible 15 Attach the clip to underside of bin by inserting clip from right to left 17 Lay bin body down Attach bin front to bin body by laying back part of front s nozzle part over top bin body s nozzle part 18 Plug latches at top of front into bin body slots 19 Turn bin around and attach top lid to bin Your bin is now fully assembled ...

Reviews: