HK Instruments DPT-2W-2500-R8 Installation Instructions Download Page 4

Copyright HK Instruments 2017

www.hkinstruments.fi

Installation version 5.0 2017

The seller is obligated to provide a warranty of five years for the deliv

-

ered goods regarding material and manufacturing. The warranty period 
is considered to start on the delivery date of the product. If a defect in 
raw materials or a production flaw is found, the seller is obligated, when 
the product is sent to the seller without delay or before expiration of 
the warranty, to amend the mistake at his/her discretion either by re

-

pairing the defective product or by delivering free of charge to the buy

-

er a new flawless product and sending it to the buyer. Delivery costs 
for the repair under warranty will be paid by the buyer and the return 
costs by the seller. The warranty does not comprise damages caused by 
accident, lightning, flood or other natural phenomenon, normal wear 
and tear, improper or careless handling, abnormal use, overloading, im

-

proper storage, incorrect care or reconstruction, or changes and instal

-

lation work not done by the seller or his/her authorized representative. 
The selection of materials for devices prone to corrosion is the buyer’s 
responsibility, unless otherwise is legally agreed upon. Should the man

-

ufacturer alter the structure of the device, the seller is not obligated to 
make comparable changes to devices already purchased. Appealing for 
warranty requires that the buyer has correctly fulfilled his/her duties 
arisen from the delivery and stated in the contract. The seller will give 
a new warranty for goods that have been replaced or repaired within 
the warranty, however only to the expiration of the original product’s 
warranty time. The warranty includes the repair of a defective part or 
device, or if needed, a new part or device, but not installation or ex

-

change costs. Under no circumstance is the seller liable for damages 
compensation for indirect damage.

The zero point should be adjusted via manual zeroing, one hour after 
installation and at least every 12 months during normal operations.

Manual zeroing:
1) Note: supply voltage must be connected at least one hour prior to 

zero point adjustment.

2) Disconnect both pressure tubes from the pressure ports l 

and -. 

3) Push the zero button at least 4 seconds until the LED light (red) 

shows one long blink. (see Figure 4)

4) The zeroing of the device will proceed automatically. Zeroing is 

complete when the LED turns off.

5) Reinstall the pressure tubes, ensuring the high pressure tube is 

connected to the port l, and the low pressure tube is 
connected to the port labled -.

STEP 6: ZEROING THE DEVICE

A. For R8 model:

The response time affects how fast the transmitter reacts to changes in 
the system. The response time is the time the device takes to reach 63 
% of the measured value. To smooth out unstable pressure fluctuations 
in airflow applications, select a longer response time.

Example:
Selected response time: 8.0 seconds
Result: Output signal achieves a new value in 20 seconds (Response 
time*5)

Use the zero button to change response time:
1) Push down and release the button quickly. LED emits 2 blinks. 

Device is set with 8.0 second response time.

2) Push down and release the button quickly again. LED emits 3 short 

blinks. Device is set with 0.8 second response time.

B. For R2 and R4 models

Use the jumper J1 to select the response time. Install jumper to J1 to 
set 0.8 s response time. Remove the jumper J1 to set 4 s response time. 
(See chart 7)

STEP 5: SELECTING THE RESPONSE TIME

0.8 s

8 s

Jumper J1

MEASUREMENT RANGE SELECTION
MEASUREMENT RANGE SELECTION

(Grey colour indicates that a jumper is installed)

WARRANTY POLICY

a) Disconnect both pressure tubes from the pressure ports labeled 
+ and –.
b) Push down the zero button (joystick) until the LED light (red) 
turns on and the display reads “zeroing” (display option only). (see 
Figure 6)
c) The zeroing of the device will proceed automatically.  Zeroing is 
complete when the LED turns off, and the display reads 0 (display 
option only).  
d) Reinstall the pressure tubes, ensuring the High pressure tube is 
connected to the port l, and the Low pressure tube is 
connected to the port labeled −.

Press down button

LED turns ON

LED

Figure 4

Chart 7

The  parts  left  over  from  installation  should  be 
recycled  according  to  your  local  instructions. 
Decommissioned  devices  should  be  taken  to  a 
recycling site that specializes in electronic waste.

RECYCLING/DISPOSAL

Summary of Contents for DPT-2W-2500-R8

Page 1: ...onitoring pressure and flow monitoring valve and damper control pressure monitoring in cleanrooms SPECIFICATIONS Performance Accuracy 1 5 FS over operation temperature range 10 50 C FS from highest pressure range including general accuracy temperature drift linearity hysteresis and repetition error Long term stability Typical 1 year 8 Pa DPT 2W 2500 Thermal effects Temperature compensated across t...

Page 2: ... relief and connect the wires to the terminal block s see step 2 3 The device is now ready for configuration WARNING Apply power only after the device is properly wired 1 Select the mounting location duct wall panel 2 Use the device as a template and mark the screw holes 3 Mount with appropriate screws Jumpers Terminal block Pressure sensor Connection for optional display LED Zero button J3 J2 J1 ...

Page 3: ...2500 Model DPT 2W 2500 R8 Chart 1 R8 ranges Chart 2 R8 jumpers Range 7 Range 8 Range 1 Range 2 Range 3 Range 4 Range 5 Range 6 Jumper J1 Jumper J2 Jumper J3 Grey colour indicates that a jumper is installed B For R4 models 1 Find the required model and measurement range and determine the range number in the header of Chart 3 2 Install jumpers on J2 and J3 in device as shown in Chart 4 Grey colour i...

Page 4: ...t least one hour prior to zero point adjustment 2 Disconnect both pressure tubes from the pressure ports labeled and 3 Push the zero button at least 4 seconds until the LED light red shows one long blink see Figure 4 4 The zeroing of the device will proceed automatically Zeroing is complete when the LED turns off 5 Reinstall the pressure tubes ensuring the high pressure tube is connected to the po...

Reviews: