16
IOM_WPHBA-WPHA_091a1201_207954_180610_EN
COMPACT HORIZONTAL PACKAGED WATER-TO-AIR UNITS
WPHBA / WPHA
INSTALLATION
INSTALLATION LOCATION
Consult and respect the rules and local regulations which regulate the installation of air conditioning systems.
Choose a site without dust and debris.
Respect the appropriate service area for the equipment which will be installed.
Verify that the ground or structure on which the unit will be installed is able to support its weight in operation.
Fit shock absorbers throughout the installation to prevent the transmission of noise and vibration.
Check that the direction of the sound level is not going to disturb anyone.
UNIT SETTLEMENT
Be sure that the unit is correctly levelled.
The bed frame should have the area and the strength to support the weight of the unit.
Be sure that after settlement the unit drain is working properly.
SERVICE AREA (mm)
Make sure to respect the following measurements for the correct operating of the unit.
WEIGHT DISTRIBUTION (kg)
MODELS
1
2
3
4
091
13
13
16
18
121
14
14
16
18
141
14
15
17
19
171
16
17
20
22
201
16
19
20
22
251
21
22
22
25
351
24
26
29
31
401
26
27
30
32
501
38
38
41
43
701
38
38
41
43
751
43
44
46
47
1001
55
56
59
60
1201
61
61
63
65
(3
– 4): Electrical Panel side