4-5
Adjust the X Value for maximum envelope.
(Page 4-6) (Use Alignment Tape.)
Check to see that the tape is not creasing
and that there is no slack on the supply
and take-up side Guide Rollers.
(Use a blank tape.)
Adjust the height of the Guide Rollers
(Supply side and take-up side).
(Use a blank tape.) (Page 4-6)
Loading (Use a blank tape.)
Adjust the envelope. (Page 4-7)
Check the envelope.
Adjust the Audio Section.
(Azimuth Alignment) (Page 4-7)
Check the audio output.
Check the following:
1. X Value (Page 4-6)
2. Envelope (Page 4-7)
Adjust the X value and envelope.
Not good
Do the final tape-traveling test to see that
the tape runs normally in play mode with-
out creasing or slacking.
Completion
Not good
OK
OK
OK
Not good
Not good
OK
Flowchart of Alignment for tape traveling
1-A
1-A
1-B
1-C
1-C
1-D
1-D
1-B, 1-C
1-B, 1-C
1-A
4-4-2 Tape Interchangeability Alignment
Note:
To do these alignment procedures, make sure that the
Tracking Control Circuit is set to the center position
every time a tape is loaded or unloaded. (Refer to
page 4-7, procedure 1-C, step 2.)
Equipment required:
Dual Trace Oscilloscope
VHS Alignment Tape (MH-1)
Guide Roller Adj. Screwdriver
Flat Screwdriver (Purchase Locally)
Note: Before starting this Mechanical Alignment, do all
Electrical Adjustment procedures.
Summary of Contents for VT-FX795A
Page 36: ...5 11 Fig DM16 41 42 43 L 13 44 45 Slide Fig DM17 ...
Page 48: ...4 3 1 Main 1 5 Schematic Diagram 3 SCHEMATIC DIAGRAMS ...
Page 49: ...5 3 2 Main 2 5 Sensor Schematic Diagrams ...
Page 50: ...6 3 3 Main 3 5 Schematic Diagram ...
Page 52: ...8 3 5 Main 5 5 Schematic Diagram ...
Page 69: ...VT FX795A VT FX795A VT FX795A No 5301E TK Digital Media Division Tokai ...