
12
Fig. 9. Standard Operation Sequence
TEST RUNNING
6.4 Test Running Record
Compile test running records according to Table 4. Utilize these records for periodic operation checks, as
well as for troubleshooting.
Operational Sequence Chart
: ON
: OFF
Operation
Equipments
Main Power Switch(*1)
OFF
ON
Room Thermostat(*1)
FAN
AUTO
ON
AUTO
COOL
OFF
ON
TH
(Stage)
COOLING CALL
1st … ON
ON
ON
ON OFF ON
2nd … ON
ON
ON OFF OFF ON
Electric
Components
Indoor Fan Motor
MIF
Outdoor Fan Motor 1,2
MOF1,2
Outdoor Fan Motor 3,4
MOF3,4
RUA-
NP13ATS
and
RUA-
NP15ATS
Normal
Start (*2)
Compressor 1 MC1
Compressor 2 MC2
Reverse
Start (*2)
Compressor 1 MC1
Compressor 2 MC2
Start Delay Time
RUA-
NP20ATS
through
RUA-
NP30ATS
Normal
Start (*2)
Compressor
1,2
MC1,2
Compressor
3,4
MC3,4
Reverse
Start (*2)
Compressor
1,2
MC1,2
Compressor
3,4
MC3,4
Start Delay Time
Safety Devices
Close Close Close Close Close Close Close Close Open
NOTES:
*1
:
Field supplied.
*2
:
Normal start and reverse start are triggered alternately by the actuation of the first stage switch
of room thermostat.
After 3 min.30 sec.
After 3 min.
After 3 min. and
After 3.5 min..
After 4 min. and
After 4.5 min.