3.2 Installation
3.2.1 Suspension bolts
(1) Consider the pipe direction, wiring and maintenance
carefully, and choose the proper direction and location
for installation.
(2) Install the suspension bolts as shown in Fig. 3.2
below.
Fig. 3.2.1 Fixing the suspension bolts
·
For the concrete
·
For the steel beam
·
For the wooden beam
150 to160mm
Screw in
(
100 to150kg
)
Steel bar
Concrete
Suspension bolts
(W3/8 or M10)
“ ”
shaped steel beam
Wood rib
60mm to 90mm
(
)
Wooden beam
Nut
Round washer
Square washer
Suspension bolts
7
3.2.2 The position of the suspension bolts and the pipes
(1) Mark the positions of the suspension bolts, the
positions of the refrigerant pipes and the drain pipes.
(2) The dimensions are shown below.
Installation and Maintenance
·
·
·
·
·
·
·
·
·
Do not install
the indoor unit in a machinery shop
Optimum air distribution is ensured.
The air path is not blocked.
Condensation can drain properly.
The ceiling is strong enough to bear the weight of the
indoor unit.
A false ceiling does not seem to be at an incline.
Sufficient clearance for maintenance and servicing
is ensured.(See Fig 3.1.1,Fig 3.1.2 )
Piping between the indoor and outdoor units is within
the allowable limits.(refer to the installation of the
outdoor unit )
The indoor unit, outdoor unit, power supply wiring
and transmission wiring must
be
kept
at least 1 meter
away from televisions and radio, which prevents image
interference and noise in those
electrical appliances.
(Noise may be generated depending on the conditions
under which the electric wave is generated, even if a
one-meter allowance is maintained).
or kitchen
where
vapor
from oil or its mist flows to
the
indoor
unit. The oil
will
deposit
on the
heat
exchanger, thereby reducing
the performance
of
the
indoor
unit, and
may deform and in the worst case,
break
the
plastic
parts
of
the
indoor
unit.
·
Use suspension bolts to install the unit, check whether
or not the ceiling is strong enough to support the
weight of the unit. If there is a risk that the ceiling is
not strong enough, reinforce the ceiling before
installing the unit. For bottom intake, replace the
chamber lid and the intake-side flange in the
(1) Remove the intake-side flange
,
then
remove
the
chamber lid. Refer to Fig. 3.1.3 for the directions.
(2) Reattach the removed chamber lid in the orientation
shown in Fig
.
3
.
1
.
4, reattach the removed intake-
side flange in the orientation as shown in Fig. 3
.
1
.
4
Suspension bolts
(W3/8 or M10)
Nut
Fig. 3.1.3
Fig. 3.1.4
Intake-side flange
Chamber lid
Intake-side flange
Chamber lid
Filter (invalid
for
Filter (invalid
for
some
models)
some
models)
.1
Air inlet
Air outlet
b
154
447
a
Model
Capacity
(
HP
)
a
b
1.0/1.5
937
900
2.0
1207
1170
procedure listed in below figures.