![Hitachi N342555809 Installation Operation & Maintenance Download Page 29](http://html.mh-extra.com/html/hitachi/n342555809/n342555809_installation-operation-and-maintenance_145400029.webp)
PV-250 Track Relay
Copyright 2019 SM 4574F, Rev. 4, March 2019
3-13
Figure 3-3. Method of Closing in of Lower Heel
Figure 3-4. Application of Bending Tools
3.7.4. Contact Block Replacement and Adjustment
3.7.4.1. Contact Block Replacement Procedure
1. Remove the old block.
2. Use a small punch to remove the small dowel pins.
3. Attach the new block with the four screws.
4. Drill a (#42 drill, 0.0935” Diameter) through the dowel pin holes into the contact
block for a total depth of 9/16” +1/32 -0.
Summary of Contents for N342555809
Page 2: ...PV 250 Track Relay Copyright 2019 SM 4574F Rev 4 March 2019 ...
Page 8: ...PV 250 Track Relay Copyright 2019 SM 4574F Rev 4 March 2019 vi ...
Page 16: ...PV 250 Track Relay Copyright 2019 SM 4574F Rev 4 March 2019 2 6 ...
Page 35: ...PV 250 Track Relay Copyright 2019 SM 4574F Rev 4 March 2019 3 19 ...
Page 36: ......
Page 46: ...PV 250 Track Relay Copyright 2019 SM 4574F Rev 4 March 2019 5 2 End of Manual ...