3
5
ED-X31E / ED-X33E (C14B-20)
Wiring diagram 2
Ballast power unit
Ballast holder
Ballast power unit
Ballast sheet
Pass the CNBAR through ballast holder hole.
Never make the excessive length between the
ballast power unit and ballast holder.
Attach FEB2 (Ferrite core) to CNPFC.
Make sure to lock hook completely.
Do not pinch cables by hook.
Attach FEB4 (Ferrite core) to CNLAP.
Make sure to lock hook completely.
Do not pinch cables by hook.
Make sure to lock the CNPFC completely.
You can not confirm the connection at the
later process.
Make sure to lock the CNLAP completely.
You can not confirm the connection at the
later process.
Preparation of the ballast power unit
(1) Connect the CNBAR, the CNPFC and the CNLAP.
(2) Use Ballast power unit white or white marked CNPFC connector is mounted.
(3) Pass CNPFC lead through FEB2, and lock hook completely.
(4) Pass CNLAP lead through FEB4, and lock hook completely.
Wiring after attaching the ballast power unit
(1) Style the CNBAR, the CNPFC and the CNLAP.
Area of Importance
Number of pins are same with the CNPFC and the CNLAP.
Never insert the wrong connectors.
FEB4
CNBAR
CNBAR
FEB2
FEB2
FEB4
CNPFC
CNPFC
CNLAP
CNLAP
Area of Importance
Area of Importance
Area of Importance
Area of Importance