12 - 8
12.6
Fixing of Instrument
(1)
Determine the installation place of the main unit through arrangement with the customer,
and fix the main unit by turning the adjuster screws.
(2)
Wipe out contaminants from the incubator by use of gauze soaked with 2% Hitergent
solution or the like, and inject deionized water into the incubator.
(3)
Check if the incubator is at a level by measuring the water level at 3 check points, and
adjust the height by turning the adjuster screws.
Fig. 12-3 Adjustment of Water Level in Incubator
12.7
Preparation for Analysis
(1)
Prepare 2% Hitergent solution in a container, and immerse the reaction cells (6 sets) in
the solution. Before turning on power, set all reaction cells.
(2) Fill at least the deionized water tank at least
3
/
4
full with deionized water.
(3) Take of the water-return tube (from pump to tank) at the tank-side to de-activate the pump.
(4) When the water raised up in this tube, fix the tube again.
12.8
Operation after Turning On Power
(1)
Turn on the main switch.
(2)
Turn on the power switch.
(3)
The initial screen (copyright notice) appears.
(4)
Enter the date.
(5)
Execute "Reset" to eliminate air bubbles from each syringe.
(6)
Execute "Incubator Water Exchange" 2 or 3 times. Check if Hitergent is injected in the
incubator with the R. probe at water exchange.
Check point
(Incubator)
(Main unit adjuster)
Summary of Contents for 902
Page 47: ...2 35 ...
Page 74: ...2 62 ...
Page 84: ...2 72 2 6 2 Parameter Code List ...
Page 91: ...2 79 ...
Page 94: ...3 2 SV4 SV10 SV9 SV5 SV6 SV8 SY2 SY3 SY16 ...
Page 97: ...3 5 ...
Page 107: ...4 4 ...
Page 109: ...4 6 ...
Page 119: ...5 9 ...
Page 120: ...5 10 ...
Page 121: ...5 11 ...
Page 122: ...5 12 ...
Page 123: ...5 13 ...
Page 124: ...5 14 ...
Page 125: ...5 15 ...
Page 126: ...5 16 ...
Page 127: ...5 17 ...
Page 128: ...5 18 ...
Page 129: ...5 19 ...
Page 130: ...5 20 ...
Page 131: ...5 21 ...
Page 132: ...5 22 ...
Page 133: ...5 23 ...
Page 142: ...7 1 7 EXPLANATION OF FUNCTION ...
Page 143: ...7 2 ...
Page 144: ...7 3 ...
Page 146: ...7 5 ...
Page 147: ...7 6 ...
Page 149: ...7 8 2 Operation reagent probe 1 Reagent probe status transition ...
Page 150: ...7 9 3 Operation photometry ISE measuremment sequence ...
Page 151: ...7 10 ...
Page 152: ...7 11 7 1 8 Photometer Check ...
Page 153: ...7 12 7 1 9 Water Exchange Incubator Water Exchange ...
Page 161: ...7 20 ...
Page 162: ...7 21 7 3 1 Status Transition routine easy analysis ...
Page 163: ...7 22 ...
Page 164: ...7 23 7 3 1 Status Transition easy analysis mode ...
Page 165: ...7 24 ...
Page 175: ...7 34 5 Rinse Nozzle Arrangement ...
Page 176: ...7 35 7 5 Maintenance Functions ...
Page 177: ...7 36 ...
Page 179: ...7 38 Details of Mechanism Check ...
Page 180: ...7 39 11 ...
Page 181: ...7 40 00 ...
Page 182: ...7 41 ...
Page 184: ...7 43 ...
Page 188: ...7 47 ...
Page 190: ...7 49 ...
Page 191: ...7 50 ...
Page 192: ...7 51 ...
Page 193: ...7 52 ...
Page 198: ...8 4 8 3 1 Fuse Arrangement AC DC 1 AC Fuses on ACDIST board F2 F3 F4 F5 F1 150 190 ...
Page 199: ...8 5 2 DC Fuses on DRV board F4 F3 F2 F1 F10 F9 F6 F8 F5 F7 390 230 ...
Page 200: ...8 6 ...
Page 207: ...9 4 1 ...
Page 208: ...9 5 1 ...
Page 209: ...9 6 1 ...
Page 214: ...9 11 1 ...
Page 219: ...10 1 10 CIRCUIT DIAGRAMS ...
Page 220: ...10 2 ...
Page 224: ...10 6 ...
Page 231: ...10 13 ...
Page 236: ...10 18 3 External View Connector for FDD DS supply connector 144 263 ...
Page 237: ...10 19 VRT 250 MVSB100 1 5 ...
Page 238: ...10 20 VRT 250 MVSB100 2 5 ...
Page 239: ...10 21 VRT 250 MVSB100 3 5 ...
Page 240: ...10 22 VRT 250 MVSB100 4 5 ...
Page 241: ...10 23 VRT 250 MVSB100 5 5 ...
Page 244: ...10 26 DI Circuit 27135200 1 5 ...
Page 245: ...10 27 DI Circuit 27135200 2 5 ...
Page 246: ...10 28 DI Circuit 27135200 3 5 ...
Page 247: ...10 29 Circuit 271352000 4 5 ...
Page 248: ...10 30 DI Circuit 27135200 5 5 ...
Page 250: ...10 32 2 External View ...
Page 251: ...10 33 ...
Page 252: ...10 34 ...
Page 253: ...10 35 ...
Page 254: ...10 36 ...
Page 255: ...10 37 ...
Page 256: ...10 38 ...
Page 257: ...10 39 ...
Page 258: ...10 40 ...
Page 259: ...10 41 ...
Page 260: ...10 42 ...
Page 262: ...10 44 ...
Page 264: ...10 46 ...
Page 265: ...10 47 ...
Page 266: ...10 48 ...
Page 267: ...10 49 ...
Page 269: ...10 51 ...
Page 271: ...10 53 ...
Page 273: ...10 55 E SENSOR Circuit Diagram ...
Page 276: ...11 1 11 CROSS WIRING REFERENCE ...
Page 277: ...11 2 ...
Page 278: ...11 3 ...
Page 279: ...11 4 ...
Page 280: ...11 5 ...
Page 281: ...11 6 ...
Page 282: ...11 7 ...
Page 283: ...11 8 ...
Page 284: ...11 9 ...
Page 285: ...11 10 ...
Page 286: ...11 11 ...
Page 287: ...11 12 ...
Page 288: ...11 13 ...
Page 289: ...11 14 ...
Page 290: ...11 15 ...
Page 291: ...11 16 ...
Page 292: ...11 17 ...
Page 293: ...11 18 ...
Page 294: ...11 19 ...
Page 295: ...11 20 ...
Page 296: ...11 21 ...
Page 297: ...11 22 ...
Page 298: ...11 23 ...
Page 299: ...11 24 ...
Page 300: ...11 25 ...
Page 301: ...11 26 ...
Page 302: ...11 27 ...
Page 303: ...11 28 ...
Page 305: ...12 1 12 INSTALLATION 12 0 Analyzer unit unpack manual ...
Page 306: ...12 2 ...
Page 326: ...13 0 13 MAINTENANCE AND INSPECTION 13 Maintenance and Inspection 13 1 ...
Page 334: ...14 6 ...
Page 335: ...14 7 ...
Page 353: ...15 6 ...
Page 373: ...16 6 ...
Page 374: ...16 7 ...
Page 375: ...16 8 ...
Page 390: ...16 23 ...
Page 418: ...16 51 ...
Page 419: ...16 52 ...
Page 421: ...16 54 ...
Page 426: ...16 59 ...