page 25 for recording test run.
able 8.1 on page 24 . And use the Table 8.2 on
Setting
8. Test Run
same Ref. cycle system.
confirm their Ref. cycle and connect wire joint to
Operate every indoor unit one by one,check and
system.
(A) Check and confirm Ref. pipe system and
communication wire link to same Ref. cycle
(D) Check to ensure that the switch on the
(C) Check to ensure that the stop valves of
(B) Check to ensure that the electrical
system joint more outdoor unit
It is necessary to set the first key of DSW5 to "OFF"
The first key of DSW5 is "ON" position shipment.
Resetting
position from the second outdoor unit when a Hi-NET
outdoor unit.
It is not necessary to set when Hi-NET joint one
Test run should be performed according to the
T
!
Do not operate the system until all the check
points have been cleared.
resistance is more than 1 megohm, by
measuring the resistance between
ground and the terminal of the electrical
parts. If not, do not operate the system
until the electrical leakage is found and
repaired.
the outdoor unit are fully opened, and
then start the system.
main power source has been ON for
more than 12 hours, to warm the
compressor oil by the oil heater.
!
Pay attention to the following items while
the system is running.
(A) Do not touch any of the parts by hand at
the discharge gas side, since the
compressor chamber and the pipes at
the discharge side are heated higher
than 90
o
C.
(B) DO NOT PUSH THE BUTTON OF THE
MAGNETIC SWITCH(ES). It will cause a
serious accident.
!
Do not touch any electrical components for
more than three minutes after turning OFF
the main switch.
!
Terminal Resistor Setting
Shipment
Resetting
Setting Terminal Resistor
!
DSW5
Setting
23