![Hirschmann OCTOPUS OS20 User Manual Download Page 22](http://html1.mh-extra.com/html/hirschmann/octopus-os20/octopus-os20_user-manual_2138040022.webp)
22
Installation OCTOPUS OS20/OS24 Unmanaged
Release 07 07/2014
2
Device installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
The following procedure has been proven to be successful for the assembly
of the device:
Unpacking and checking
Connecting the connector for the supply voltage
Installing the device and grounding
Connecting the ferrite (only devices with operating voltage type F)
Connecting the supply voltage, starting up
Connecting the data lines
2.1
Unpacking and checking
Check that the contents of the package are complete
(see page 35
“Scope of delivery”)
.
Check the individual parts for transport damage.
2.2
Connecting the connector for the
supply voltage
Note:
Only connect the device to a power supply that complies to surge
voltage category II or lower.
Summary of Contents for OCTOPUS OS20
Page 38: ...38 Installation OCTOPUS OS20 OS24 Unmanaged Release 07 07 2014...
Page 40: ......