
10.1 External Input/Output Connector and Signals
179
10
•
Only the RM3545-02 can be used for multiplexer-related control.
•
The 0ADJ signal should be asserted (ON) for at least 10 ms.
•
The connector's frame is connected to the instrument's rear panel (metal portions) as well
as the power inlet's protective ground terminal.
When switching the panel load or multiplexer channel using a command or key operation,
fix pins 4 to 6 and 22 to 24 to on or off.
(1) Isolated power supply
(2) Input Signals
Signal Descriptions
Pin
Signal name
NPN/PNP switch setting
NPN
PNP
8
ISO_5V
Isolated power
5 V
Isolated power
supply -5 V
9, 27
ISO_COM
Isolated common signal ground
TRIG
The TRIG signal operates at either the ON or OFF edge. ON or OFF edge
triggering can be selected on the EXT I/O setting screen (default: ON edge).
•
When external triggering (EXT) is enabled
The TRIG signal causes one measurement to be performed.
•
When internal triggering (INT) is enabled
The TRIG signal does not trigger measurement.
A wait is necessary to allow the measured value to stabilize after switching
ranges or loading a panel. The wait time varies with the measurement target.
After TRIG signal input, statistical calculations for the most recently updated
measured value (p.111) and data memory (p.233) are performed. Trigger
input can also be performed using the
ENTER
(trigger) key or the
∗
TRG
com-
mand.
0ADJ
When the 0ADJ signal is switched from OFF to ON, one zero-adjustment
operation will be performed at the signal edge.
To avoid malfunction, this signal should be asserted (ON) for at least 10 ms.
The ERR signal turns ON when zero-adjustment fails.
Asserting the PRINT signal prints the current measured value.
CAL
When the CAL signal is changed from off to on while using the manual self-
calibration setting, self-calibration will start at that edge. The signal will be
disabled when using auto self-calibration.
The time required for self calibration is approximately 400 ms.
If asserted during measurement, executes after the end of measurement.
Summary of Contents for RM3545
Page 2: ......
Page 4: ......
Page 26: ...Operating Precautions 18...
Page 42: ...1 5 Checking the Measurement Target 34...
Page 54: ...2 6 Pre Operation Inspection 46...
Page 70: ...3 5 Checking Measured Values 62...
Page 226: ...10 6 Supplied Connector Assembly 218...
Page 290: ...Chapter 13 Specifications 282...
Page 312: ...14 4 Disposing of the Instrument 304...
Page 349: ...Appendix 18 Outline Drawing A37 Appendix Appendix 18 Outline Drawing...
Page 362: ...Index Index 4...
Page 363: ......
Page 364: ......